Humiley group INC is an integrated engineering and manufacturing company delivering high-performance solutions for Life Sciences and regulated industrial environments.
We specialize in cleanroom HVAC, electrical systems, automation, ELV, and GMP-compliant facility engineering — supporting projects from concept design through manufacturing, commissioning, validation, and lifecycle services.
With multidisciplinary engineering, in-house manufacturing, and structured project delivery under one accountable team, we ensure quality consistency, regulatory compliance, and long-term operational reliability.
Our expertise spans pharmaceutical, biotechnology, medical device, semiconductor, and advanced manufacturing facilities where precision, environmental control, and compliance are critical to operational success.
Humiley’s vision is to become the premier integrated engineering partner for the life sciences and high-performance industrial sectors globally by 2030. We will achieve this worldwide leadership by advancing four strategic commitments:
We are committed to engineering safe, compliant, and high-performance environments that support life sciences innovation, ensure patient safety, and meet the most demanding global standards.
INNOVATION
PARTNERSHIP
EXCELLENCE
COMPLIANCE
INTEGRITY

TONY
CEO
Chief Executive Officer of Humiley Engineering & Solutions, with more than 20 years of experience in Life Sciences engineering, cleanroom HVAC, electrical systems, and industrial automation.
Under his leadership, Humiley has evolved into an integrated engineering and manufacturing company delivering GMP-compliant solutions for pharmaceutical and high-performance industrial facilities across the Asia-Pacific region.

MATTHEW
PROJECT MANAGER
A disciplined and efficient management approach with a win-win mindset, focused on creating sustainable value for both the company and its clients. With over 5 years of experience in project management and operations across domestic and international projects, strong capabilities are demonstrated in strategic planning, risk management, and financial control, ensuring on-time delivery, client satisfaction, and cost optimization.

JIN
SENIOR ELECTRICAL ENGINEER
Electrical Supervisor and Designer with over 5 years of experience delivering GMP- and EU-compliant electrical systems for pharmaceutical manufacturing facilities. Specializing in design verification, site supervision, and commissioning of power distribution, lighting, grounding, and control systems. Proven expertise in managing procurement, construction workflows, and cross-functional teams, ensuring projects are completed on time, within budget, and to the highest quality standards. Experienced in the production of precise technical drawings and documentation to ensure seamless system commissioning, while consistently meeting regulatory compliance and safety standards.

SEAN
LEAD - AUTOMATION & TRANSFORMATION
Automation Lead with 10+ years of experience delivering validated automation systems for pharmaceutical manufacturing in compliance with GMP-WHO, EU-GMP, and 21 CFR Part 11.
Specialized in SCADA and Electronic Batch Record (EBR) systems, with full lifecycle experience from system design, programming, and integration to Computer System Validation (CSV), including IQ/OQ/PQ documentation, risk assessment, and traceability matrix development. Proven ability to work closely with QA/QC and validation teams to ensure systems meet stringent regulatory expectations.

DANIEL
LEAD ELV CONSULTANT
With over 10 years of experience in supervising and designing Extra Low Voltage (ELV) systems for pharmaceutical manufacturing facilities, strictly complying with GMP -WHO and EU -GMP standards. Specialized in project design, site supervision, and operation of ELV systems such as PA, ACCE, CCTV, Network, access control, and telecommunication infrastructure. Extensive experience in coordinating with MEPF disciplines, cleanrooms, HVAC, and critical utilities to ensure seamless integration and stable operations.

DAVID
FIELD MANAGER
A mechanical engineering professional with over 20 years of experience in construction execution, specializing in panel fabrication, metal welding, and HVAC duct installation for industrial and civil projects. Extensive expertise includes mechanical fabrication, technical drawing interpretation, construction management, team coordination, site supervision, progress monitoring, quality control, and ensuring compliance with technical specifications and HSE requirements.