Skip to content

HUMILEY GROUP INC

Integrated engineering for Life Sciences and high-performance industry

Humiley Group INC designs, delivers, and maintains Life Sciences and industrial facilities, with equipment built by qualified manufacturing partners.

Standards we design and document to

  • EU-GMP
  • WHO-GMP
  • US-FDA
  • PIC/S
  • ISO 14644
  • EU-GMP Annex 1
  • 21 CFR Part 11
  • EU-GMP Annex 11
  • GAMP 5
  • ALCOA+
  • DQ / IQ / OQ / PQ
  • ISO 9001-aligned
  • EN 1886
  • EN 1822
  • HEPA H13 / H14
  • ULPA

Why Humiley

Competitive Strengths

Four capabilities decide whether a regulated facility passes its first qualification audit: knowing the regulated environment, designing to the standard it will be inspected against, holding the whole control architecture under one team, and staying with the plant after handover. Humiley is built around all four.

Life Sciences Expertise

Deep expertise in pharmaceutical, biotech, sterile, and other GMP-regulated environments — delivering engineering that is compliant by design.

GMP-Compliant Design & Execution

Engineering and project execution aligned with EU-GMP, ISO 14644, WHO-GMP, and validation lifecycle requirements from design through qualification.

Integrated Cleanroom Technology & Control Architecture

HVAC, cleanroom, electrical, ELV, automation, and EMS/QBMS systems delivered under one coordinated engineering team.

Experienced Multidisciplinary Team

From concept design and manufacturing oversight to commissioning, validation, and lifecycle support — ensuring accountability at every stage.

What we do

Core Business

Humiley Group INC delivers integrated engineering solutions for Life Sciences and high-performance industrial facilities — from concept design and partner-built equipment to long-term operational support.

Our core business divisions are:

  • Engineering Consultancy & Design: Multidisciplinary engineering for GMP-compliant facilities, including cleanroom HVAC, electrical, automation, ELV, and utility systems.
  • Project Management: Structured EPCM and project management services covering quality, schedule, cost, and regulatory control throughout the project lifecycle.
  • Manufacturing & Distribution: Customized, mission-critical HVAC equipment and advanced cleanroom technologies. Every unit is designed from the project's own airflow schedule and control narrative, then built by qualified manufacturing partners under our engineering control.
  • Maintenance Services: Preventive, corrective, and lifecycle maintenance supporting reliable operation, system performance, and long-term compliance.

Because design, manufacturing oversight, execution, and maintenance sit in one organization, there is a single accountable team across the life of the facility — and no gap in accountability for a problem to fall into.

By the numbers

What our engineering is measured on

Each figure below is stated, with its context, on the service or industry page it comes from.

20+
EU-GMP / WHO-GMP facilities our management team has worked on
30%
Target reduction in HVAC energy
±2% RH
Dehumidification precision
22 kV
LV to MV power distribution
−60°C
Gigafactory dry-room dew point
4
Divisions under one accountable team

Services and Solutions

One accountable team across the facility lifecycle

Design, partner-built equipment, project delivery and maintenance under a single engineering organization.

Pharmaceutical-grade HVAC and cleanroom equipment produced through qualified, EU-GMP-aligned manufacturing partners.

Learn more

Preventive and predictive maintenance, with 24/7 response under service agreement, that keeps critical systems compliant and running.

Learn more

Industries

Critical environments cannot be commoditized

Turnkey EU-GMP / WHO-GMP facilities for pharmaceutical, biotech, medical device, and healthcare production — engineered for sterility assurance, data integrity (ALCOA+), and seamless regulatory compliance.

Learn more

Precision engineering for semiconductor and high-tech fabrication — ultra-clean environments with tight temperature, humidity, and particulate control for high yield and reliable, uninterrupted operation.

Learn more

Controlled environments and robust power infrastructure for the energy transition — from battery gigafactory dry rooms to hybrid Solar–Wind–BESS systems engineered for efficiency, safety, and long-term performance.

Learn more

Our Values

Our Values

We are committed to engineering safe, compliant, and high-performance environments that support Life Sciences innovation, ensure patient safety, and meet the most demanding global standards.

  • INNOVATION

    Continuously innovate to improve efficiency and competitiveness.

  • PARTNERSHIP

    Build long-term, trusted relationships for shared success.

  • EXCELLENCE

    Deliver high-quality performance and outstanding results.

  • COMPLIANCE

    Comply strictly with the regulations and standards our clients are inspected against.

  • INTEGRITY

    Operate with honesty and transparency in all activities.

Brands & companies

Equipment brands and companies we work with

  • Rockwell Automation
  • Nidec
  • ebm-papst
  • Kingspan
  • Schneider Electric
  • Siemens
  • COPA-DATA
  • Trane
  • Mega HVAC
  • Belden
  • Coolmate
  • Cyclo
  • SOS Duct
  • AEX
  • Milesight
  • Ruckus
  • Fortinet
  • Danfoss
  • Air+
  • Puresci

Where we are

Two offices, one engineering team

A United States headquarters and a Viet Nam engineering base, working to the standard of whichever market the product is destined for.

Southeast Asia

Design, project delivery, equipment supply and maintenance, with 24/7 corrective and emergency response for facilities under service agreement.

United States

Corporate headquarters, client and supplier relationships, and engineering aligned to US-FDA cGMP and 21 CFR Part 11 expectations.

International markets

Facilities engineered for EU-GMP, WHO-GMP and PIC/S inspection wherever the product is destined, with the governing market fixed in the design basis at the start.

Headquarters

1548 S Gladys Ave, San Gabriel, CA 91776, USA

Viet Nam office

175 Phan Chu Trinh, Binh Loi Trung Ward, Ho Chi Minh City, Viet Nam

Technical notes

From our engineers

Set a device assembly room's class from the product's risk

ISO 13485 §6.4.2 asks for documented contamination control without naming a cleanroom class. Setting the class from sterilisation method, patient contact and bioburden sensitivity often lands device assembly at ISO 8, with ISO 7 only where needed, less air than Grade C, a smaller AHU and a reason an auditor can read.

InsightRead

Maintenance that keeps the validated state

A filter changed on night shift without a leak test turns maintenance into a deviation. GMP maintenance works from criticality bands built on the asset register, planned and corrective work in one system, risk-based requalification and calibration, and 24/7 response across Southeast Asia under a maintenance agreement.

InsightRead

Technical resources

The vocabulary of regulated engineering, defined

77 terms from our design bases, qualification protocols and maintenance reports — cleanroom classification, filtration, clean utilities, validation and data integrity — each with the standard that governs it.

Questions

Answered by our engineers

The questions clients ask before a first meeting — answered in Humiley's own words.

Ask us something else

Humiley Group INC delivers integrated engineering for Life Sciences and high-performance industrial facilities — design, project delivery, equipment built by qualified manufacturing partners under Humiley's engineering control, commissioning and lifecycle maintenance.

Humiley aligns engineering and project execution with EU-GMP, ISO 14644, WHO-GMP, and validation lifecycle requirements from design through qualification. Validation strategy, URS, and the qualification roadmap (DQ/IQ/OQ/PQ) are developed in parallel with design — audit-ready for EU-GMP, WHO, US-FDA, and PIC/S.

Life Sciences — pharmaceutical, biotech, medical device and healthcare production; Semiconductor Industry — ultra-clean environments with tight temperature, humidity and particulate control; and Renewable Energy — from battery gigafactory dry rooms to hybrid Solar–Wind–BESS systems.

Engineering Consultancy & Design, Project Management, Manufacturing & Distribution, and Maintenance Services — unifying expert design, equipment built to that design by qualified manufacturing partners, controlled execution, and dedicated maintenance under one accountable organization.

Humiley is headquartered at 1548 S Gladys Ave, San Gabriel, CA 91776, USA, with a Viet Nam office at 175 Phan Chu Trinh, Binh Loi Trung Ward, Ho Chi Minh City. The headquarters is open Monday to Friday, 8:00 AM to 5:00 PM Pacific Time, and the Viet Nam office Monday to Saturday, 8:00 AM to 5:00 PM (GMT+7).

Yes. Humiley provides preventive, corrective, and lifecycle maintenance services that support reliable operation, system performance, and long-term compliance. For facilities under a maintenance agreement, technicians provide round-the-clock corrective and emergency response across Southeast Asia.