Personnel - Material - Waste - Flows
Across GMP standards (WHO, EU, or PIC/S), cross-contamination and mix-ups are the two biggest enemies. No matter how advanced the equipment is, a facility becomes meaningless if operator traffic intersects with waste flow, or if unreleased materials share routes with finished products.