
Pressure Cascade Systems & Containment Strategies: Protecting Cleanroom Integrity in Pharma
In pharmaceutical manufacturing, controlling airflow direction is critical to prevent contamination and ensure GMP compliance.
Pressure cascade systems create controlled pressure differentials between cleanroom zones to achieve:
Key containment strategies include:
A well – designed pressure cascade is more than HVAC engineering – it is a core element of the facility’s Contamination Control Strategy (CCS) under EU GMP Annex 1.