About Humiley
Humiley delivers Project Management Consultancy (PMC) and turnkey solutions for Pharmaceutical & Life Sciences industries, helping launch GMP - compliant facilities on time and audit-ready.
The role
Provide on-site PMC oversight of all electrical packages — from utility intake and MV/LV distribution to lighting, small power, earthing, UPS and standby generation — ensuring that power systems serving the GMP plant are installed safely, reliably and in full compliance with the IEC suite, local regulations and the project specifications.
Position Snapshot
Job Title: Electrical Engineer – PMC
Department: Project Management Consultancy – PMC
Reports To: PMC Project Manager/Lead MEP Engineer
Location: Houston, US
Type: Full-time, Site-based
Grade: Engineer / Senior Engineer
Headcount: 01 (open until filled)
Key Responsibilities
- Review electrical design deliverables — single-line diagrams, load schedules, short-circuit and protection coordination studies, cable schedules and lighting calculations.
- Supervise the installation of MV/LV switchgear, transformers, MCC, distribution boards, busways, cable trays, lighting and small-power systems.
- Witness Factory & Site Acceptance Tests for switchgear, transformers, UPS, ATS and DG sets; verify test reports against IEC 61439, 60076, 62040 and 60947.
- Verify earthing, equipotential bonding and lightning protection in accordance with IEC 62305 and TCVN; sign off on continuity, insulation and earth-loop test records.
- Coordinate interfaces with HVAC, Automation, ELC, Process Utilities and Civil packages, resolving design clashes and managing the cable-route master plan.
- Monitor contractor progress and quality, issue daily reports, NCRs and punch-list items; drive timely closure and escalate risks to the PMC Project Manager.
- Support energization, hot-commissioning and the C&Q lifecycle, including IQ/OQ for electrical systems serving GMP areas.
- Champion electrical safety, LOTO (Lock-Out/Tag-Out), arc-flash assessment (IEEE 1584), live-line work permits and energy efficiency throughout construction and energization.
- Verify power-quality, harmonic profile (THDi/THDv), power-factor correction and load balancing using on-site analyzers; coordinate with BMS for energy-KPI dashboards.
- Interface daily with Civil (cable trench / earth grid), HVAC (motor starters / VFD), Automation (BMS / SCADA), ELC (life-safety integration) and Process Utility teams.
Who We Are Looking For
- Bachelor of Engineering in Electrical / Power Systems / Electrical & Electronics Engineering.
- Minimum 5 years of site experience on industrial or pharmaceutical projects with proven exposure to MV (≥ 22 kV) and LV (400 V) distribution.
- Hands-on knowledge of IEC 60364, IEC 61439, IEC 62305, IEEE 519, NFPA 70 (NEC) and TCVN 7447/QCVN 12 electrical codes.
- Proficiency in AutoCAD Electrical, Revit MEP, ETAP / DIgSILENT / EasyPower, DIALux / Relux and MS Project / Primavera P6.
- Vietnam Class-3 Electrical Practitioner Licence (or equivalent international certification — IET, IEEE PE) is preferred.
Competencies
- Technical: MV/LV distribution architecture, protection grading (Time-Current Curves) and selectivity studies. Earthing (TT/TN-S/IT), EMC and lightning protection design (IEC 62305 Levels I–IV). UPS (online double-conversion), ATS, diesel generators with synchronization, harmonic mitigation and active filtering. GMP electrical zoning (clean / dirty utilities), uninterruptible critical-load supply, BMS interface and CSV-ready validation. Industrial lighting design (lux levels 200–1000), DALI control, emergency & exit-sign systems compliant to QCVN 06 and NFPA 101.
- Behavioral: Disciplined, safety-first mindset. Analytical and decisive in resolving site issues. Strong stakeholder communication in EN/VN. Continuous-improvement orientation.
Why Join Humiley
- High-Impact Projects: Work on landmark EU-GMP, WHO-GMP, and PIC/S pharmaceutical facilities alongside a world-class team of US, EU, and Vietnam-trained senior engineers.
- Empowered Culture: Thrive in a flat, evidence-driven organization where your technical opinion is valued from Day 1, and decisions are made based on data, not seniority.
- Global Interaction: Engage directly with major international clients from the US, EU, and Japan, and gain firsthand experience hosting inspections from top tier global auditors.
- Professional Mastery: Access Humiley sponsored international certifications (PMP, FIDIC, GAMP 5, ISPE, BICSI) with fully covered exam fees and paid study leave.
- Modern Flexibility: Benefit from a hybrid working model and a "Family-First" mindset that balances site-based delivery with remote design and reporting phases.
Career Path & First 90 Days
Clear progression path with bi-annual reviews. Initial 90 days focus on onboarding, taking ownership of site scope, and leading processes.
What We Offer
- Competitive Salary: Highly attractive base salary benchmarked to the upper-quartile of the market, with a range of up to 4400 USD per month.
- Guaranteed Bonuses: 13th-month salary plus performance and project-completion bonuses (typically 1–3 months of base salary per project).
- Comprehensive Care: Premium healthcare package for employee, spouse, and children, plus full statutory insurance (SHUI).
- Workplace Benefits: Site allowance, overtime/meal allowance, and full reimbursement for all business travel.
- Professional Growth: 20 days annual leave and a dedicated budget for international certifications, including paid study leave and exam fees.
Send your CV (PDF, English preferred) together with a one-page cover note to careers@humiley.com with the subject line: "JDCode – Your Full Name".