Skip to content

HUMILEY GROUP INC

About Us

Humiley Group INC is an integrated engineering company for Life Sciences and regulated industry, with equipment built by qualified manufacturing partners.

Who we are

Who We Are

Humiley Group INC is an integrated engineering company for Life Sciences and regulated industry, with equipment built by qualified manufacturing partners.

We specialize in cleanroom HVAC, electrical systems, automation, ELV, and GMP-compliant facility engineering — supporting projects from concept design through partner manufacturing, commissioning, validation, and lifecycle services.

With multidisciplinary engineering, equipment engineered and quality-controlled by us, and structured project delivery under one accountable team, we design for consistent quality, regulatory compliance, and long-term operational reliability.

Our expertise spans pharmaceutical, biotechnology, medical device, semiconductor, and advanced manufacturing facilities where precision, environmental control, and compliance are critical to operational success.

Global footprint

How we work across borders

A United States headquarters and a Viet Nam engineering base, working to the standard of whichever market the product is destined for.

  • Southeast Asia

    Design, project delivery, equipment supply and maintenance, with 24/7 corrective and emergency response for facilities under service agreement.

  • United States

    Corporate headquarters, client and supplier relationships, and engineering aligned to US-FDA cGMP and 21 CFR Part 11 expectations.

  • International markets

    Facilities engineered for EU-GMP, WHO-GMP and PIC/S inspection wherever the product is destined, with the governing market fixed in the design basis at the start.

Regulated manufacturing is a global business built on local execution. A product made in Viet Nam for a European market is inspected against EU-GMP; the same plant supplying WHO-prequalified products answers to WHO-GMP, and a US market means cGMP and 21 CFR Part 11. The facility does not change, but the evidence it has to produce does — so the market a client is building for is one of the first things recorded in the design basis.

Our structure follows that reality. Corporate and commercial functions sit in the United States; design, project delivery, manufacturing coordination and maintenance are run from Ho Chi Minh City, where the projects are. This keeps engineering close to the sites it serves without loosening the documentation discipline that an international inspection requires.

It also means we design for the climate the facility is actually in. Plant sized on temperate assumptions will not hold a Grade B suite through a tropical wet season, and it is one of the most common reasons an imported design underperforms after commissioning. Dehumidification capacity, peak dew-point sizing and the reheat penalty are treated as primary design decisions in this region rather than as a trim exercise.

Headquarters

San Gabriel, United States

1548 S Gladys Ave, San Gabriel, CA 91776, USA

  • Corporate governance and commercial contracting
  • US and international client relationships
  • Regulatory alignment for US-FDA cGMP projects
  • Commercial contracts with suppliers and manufacturing partners

Engineering and delivery office

Ho Chi Minh City, Viet Nam

175 Phan Chu Trinh, Binh Loi Trung Ward, HCMC

  • Multidisciplinary design and BIM coordination
  • Project management and site delivery
  • Manufacturing coordination and factory acceptance testing
  • Maintenance and calibration across Southeast Asia, with 24/7 response under service agreement

Where we are going

Vision 2030

By 2030 Humiley intends to be the engineering partner that Life Sciences and high-performance industrial clients bring in when the facility has to pass inspection the first time. Four commitments get us there:

  • Engineering and consulting: Deepen the multidisciplinary team so that HVAC, electrical, ELV, automation and utilities are designed against one Contamination Control Strategy rather than coordinated after the fact.
  • Project delivery: Require stage-gate governance, earned value reporting and an FMEA-based risk register on every project, from FEED through to Performance Qualification.
  • Cleanroom technology: Extend our partner manufacturing program for hygienic air handling, filtration and dehumidification equipment, designed for the tropical wet-bulb conditions that defeat imported plant.
  • Operational support: Grow criticality-based maintenance agreements that keep a facility in its validated state and produce the records to evidence it.

What we stand for

Our Values

We are committed to engineering safe, compliant, and high-performance environments that support Life Sciences innovation, ensure patient safety, and meet the most demanding global standards.

  • INNOVATION

    Continuously innovate to improve efficiency and competitiveness.

  • PARTNERSHIP

    Build long-term, trusted relationships for shared success.

  • EXCELLENCE

    Deliver high-quality performance and outstanding results.

  • COMPLIANCE

    Comply strictly with the regulations and standards our clients are inspected against.

  • INTEGRITY

    Operate with honesty and transparency in all activities.

Why Humiley

Why clients bring us in

Four things clients tell us are the reason, each of them a consequence of how the company is put together rather than a claim about it.

One team across the whole lifecycle

The people who set the design basis are the ones who coordinate manufacturing, run the site and maintain the facility afterwards. Nothing is lost at a handover between firms, because one team carries the project from design basis to maintenance.

Compliance engineered in, not audited on

The validation strategy, the User Requirement Specification and the qualification roadmap are written in parallel with the design. Qualification protocols are drafted from documents that already exist, which is what a first-time audit pass actually depends on.

Designed for the climate it is built in

Holding Grade A and B conditions through a tropical wet season is a different engineering problem from holding them in a temperate one. Sizing for the peak dew-point design condition and staging dehumidification correctly is routine work for us and a late discovery for many imported designs.

Evidence you can hand to an inspector

Every design decision is traceable from the requirement, through the calculation and the drawing, to the test that verified it. When someone asks why a room is held at the pressure it is held at, the answer is in the record.

Ways to work with us

Four ways clients engage Humiley

Each division stands on its own, and they compound when they are combined.

Engineering consultancy and design

A full design package from user requirements through to issued-for-construction drawings, Design Qualification and tender support — or a defined study, gap assessment or second opinion on an existing package.

Suits a new facility, an expansion, or a design that needs review before it is committed.

Learn more

EPCM project delivery

We manage engineering, procurement and construction on your behalf under a stage-gate structure, with earned value reporting, an FMEA-based risk register and an audit-ready handover package.

Suits a project where scope will develop and cost transparency matters more than a single fixed price.

Learn more

Equipment supply

Hygienic air handling units, fan filter units, HEPA housings, dehumidifiers, control panels and modular cleanroom systems, engineered to the project specification and witness-tested at FAT before delivery.

Suits a client who has their own contractor and needs equipment built to an approved specification.

Learn more

Maintenance and lifecycle support

A criticality-based maintenance agreement covering planned and corrective work, condition monitoring, periodic requalification, calibration and 24/7 response — with the records to evidence the validated state.

Suits an operating facility, whether or not Humiley built it.

Learn more

Governance

The standards we hold ourselves to

Quality, safety and data discipline are the parts of engineering that only become visible when they are missing. These are the standards we work to and the practices behind them.

Quality management

An ISO 9001-aligned quality management system governs procedures, document control, non-conformance and corrective action across design, delivery and service. Every deliverable is versioned, approved and traceable to the requirement it answers.

Health, safety and environment

Site work runs under an ISO 45001 and ISO 14001-aligned framework — permits to work, method statements, task risk assessments and incident reporting. Every Humiley employee is empowered to stop work that is not safe.

Data integrity

Monitoring and control systems are specified so their records are attributable, contemporaneous and unalterable, following ALCOA+ principles and the requirements of 21 CFR Part 11 and EU GMP Annex 11.

Regulatory alignment

Design and project execution are aligned with EU GMP, WHO GMP, US FDA cGMP, PIC/S and ISO 14644, with the qualification roadmap developed alongside the design rather than after it.

Environmental responsibility

Energy modeling, airflow simulation, heat recovery and demand-controlled ventilation are applied to reduce consumption without compromising classified conditions, targeting a 30% reduction in HVAC energy use.

Accountability

Design, manufacturing coordination, delivery and maintenance sit under one engineering organization, so there is a single accountable team across the facility lifecycle rather than a boundary for a problem to fall into.

Leadership

Management Team

  • TONY

    CEO

    Chief Executive Officer of Humiley Engineering & Solutions, with more than 20 years of experience in Life Sciences engineering, cleanroom HVAC, electrical systems, and industrial automation.

    Under his leadership, Humiley is organized as one integrated engineering company — design, project management, equipment built by qualified manufacturing partners under Humiley engineering control, and maintenance — serving pharmaceutical and high-performance industrial facilities.

  • MATTHEW

    PROJECT MANAGER

    Brings a disciplined, efficient management approach focused on creating sustainable value for both the company and its clients. With over 5 years of experience in project management and operations across domestic and international projects, Matthew has demonstrated strong capabilities in strategic planning, risk management, and financial control, ensuring on-time delivery, client satisfaction, and cost optimization.

  • JIN

    SENIOR ELECTRICAL ENGINEER

    Electrical Supervisor and Designer with over 5 years of experience delivering EU-GMP-compliant electrical systems for pharmaceutical manufacturing facilities. Specializing in design verification, site supervision, and commissioning of power distribution, lighting, grounding, and control systems. Proven expertise in managing procurement, construction workflows, and cross-functional teams, ensuring projects are completed on time, within budget, and to the highest quality standards. Experienced in the production of precise technical drawings and documentation to ensure seamless system commissioning, while consistently meeting regulatory compliance and safety standards.

  • SEAN

    AUTOMATION & TRANSFORMATION LEAD

    Automation Lead with 10+ years of experience delivering validated automation systems for pharmaceutical manufacturing in compliance with WHO-GMP, EU-GMP, and 21 CFR Part 11. Specialized in SCADA and Electronic Batch Record (EBR) systems, with full lifecycle experience from system design, programming, and integration to Computer System Validation (CSV), including IQ/OQ/PQ documentation, risk assessment, and traceability matrix development. Proven ability to work closely with QA/QC and validation teams to ensure systems meet stringent regulatory expectations.

  • DANIEL

    LEAD ELV CONSULTANT

    Brings over 10 years of experience supervising and designing Extra Low Voltage (ELV) systems for pharmaceutical manufacturing facilities, in strict compliance with WHO-GMP and EU-GMP standards. Specialized in project design, site supervision, and operation of ELV systems such as PA, CCTV, network, access control, and telecommunication infrastructure. Extensive experience in coordinating with the MEPF, cleanroom, HVAC, and critical-utility disciplines to ensure seamless integration and stable operations.

  • DAVID

    FIELD MANAGER

    A mechanical engineering professional with over 20 years of experience in construction execution, specializing in panel fabrication, metal welding, and HVAC duct installation for industrial and civil projects. Extensive expertise includes mechanical fabrication, technical drawing interpretation, construction management, team coordination, site supervision, progress monitoring, quality control, and ensuring compliance with technical specifications and HSE requirements.

Brands & companies

Equipment brands and companies we work with

  • Rockwell Automation
  • Nidec
  • ebm-papst
  • Kingspan
  • Schneider Electric
  • Siemens
  • COPA-DATA
  • Trane
  • Mega HVAC
  • Belden
  • Coolmate
  • Cyclo
  • SOS Duct
  • AEX
  • Milesight
  • Ruckus
  • Fortinet
  • Danfoss
  • Air+
  • Puresci

Talk to our engineers

Tell us about your facility and we will route your inquiry to the right engineering lead.