We run engineering, procurement and construction on your behalf under a stage-gate structure that carries a project from concept through to Performance Qualification. Earned value reporting, a live FMEA-based risk register reviewed weekly, and a RACI every stakeholder has seen keep the schedule, the cost and the compliance position visible while there is still time to act on them.

Services and Solutions

Introduction

Delivery closes the way an inspection needs it to: commissioning and Site Acceptance Testing into IQ/OQ/PQ, then a handover package that is versioned, approved and traceable from each requirement to the test that verified it.

Overview

Delivery as a controlled process, not a series of recoveries

A project that reports well but cannot show its evidence is not under control. Our project management exists to make the schedule, the cost and the compliance position visible early enough to act on.

Complex facility projects rarely fail on one decision. They drift — a vendor drawing approved late, a scope change absorbed without a schedule impact assessment, a qualification prerequisite discovered during commissioning. Each is small in isolation, and together they move a handover date by a quarter. Controls exist to make that drift measurable while there is still time to correct it.

We run projects on a stage-gate structure. Every gate has entry criteria, a defined deliverable and a named approver, and nothing passes on the basis that the next stage is already under pressure. Progress is measured with Earned Value against a baselined schedule and cost plan, so a variance is a number with a cause rather than a percentage someone estimated in a meeting.

The commercial and technical sides are managed together. Procurement is sequenced against the qualification program, so long-lead items with validation implications are ordered against approved specifications rather than provisional ones. Factory Acceptance Testing is treated as the point where an equipment problem is still the vendor's to fix, not the site's.

Regulatory outcome is a project deliverable in its own right. The qualification program is planned from the start, documentation is version-controlled throughout, and the handover pack is assembled as the project runs rather than reconstructed at the end. A project closes when the evidence is complete, not when the last contractor leaves site.

Capabilities

Scope of work

Disciplined EPCM delivery with PMBOK-aligned governance, from concept to qualified handover.

Disciplined EPCM Execution

We implement structured stage-gate methodologies, from concept to Performance Qualification. We utilize Earned Value Management (EVM), weekly FMEA-based risk reviews, and strict document control to ensure predictable, on-time project outcomes across our global footprint.

PMP-Aligned Governance & Reporting

Our Project Management Office operates on PMBOK-aligned governance with a clear RACI for every stakeholder. Transparent monthly reports — covering schedule, cost, earned value, and risk — give you full visibility and control at every stage of delivery.

Risk Management & Quality Assurance

We maintain a live, FMEA-based risk register from feasibility through qualification, reviewed weekly. Combined with our ISO 9001-aligned quality management system, this proactive approach protects your schedule, budget, and compliance position before issues can escalate.

Vendor, Procurement & Construction Management

From vendor selection and procurement through to on-site supervision, we manage the full execution chain. Factory and Site Acceptance Testing (FAT/SAT), inspection, and progress control check equipment at the factory and installed systems on site against the approved specification.

Commissioning & Qualification

We bridge construction and operation through structured commissioning, Site Acceptance Testing (SAT), and DQ/IQ/OQ/PQ qualification. Executed jointly with your QA/QC teams, this ensures every system is verified, documented, and ready for regulatory inspection.

Audit-Ready Handover

Every project closes with a complete, traceable documentation package. Versioned, approved, and archived for client audit, our handover packs carry your facility seamlessly from construction into qualified, validated operation.

Our approach

The delivery sequence

Each gate closes on approved evidence. Where a gate cannot be met, the impact is quantified and escalated rather than absorbed.

  1. Project setup and governance

    The execution plan, work breakdown structure, baselined schedule and cost plan are established, along with a RACI that names an accountable person for every deliverable. Document control, change control and the reporting cycle are agreed before the first package is issued, so the project has a system to run through rather than one assembled under pressure.

    Output

    • Project execution plan
    • WBS and baselined schedule
    • Cost plan and cash-flow forecast
    • RACI and communication plan
  2. Design management and procurement

    Design deliverables are tracked against the schedule and released through a formal review. Packages are tendered on technical compliance as well as price, vendor drawings are reviewed against the specification before fabrication, and long-lead equipment with qualification implications is placed early against approved documents.

    Output

    • Design deliverable register
    • Tender packages and bid evaluations
    • Purchase orders and vendor document schedule
  3. Construction management and HSE

    Site work runs against an Inspection and Test Plan with defined hold and witness points. Progress, quality and safety are recorded together — a section is not complete because it looks complete, but because the inspection record says so. HSE performance is managed actively, with permits, method statements and risk assessments controlled on site.

    Output

    • Inspection and Test Plan
    • Site progress and quality records
    • HSE plan, permits and incident register
  4. Commissioning and system turnover

    Systems are set to work, balanced, tuned and functionally tested in a planned sequence, with Site Acceptance Testing against the approved specification. Turnover packages are compiled system by system so qualification starts from a complete, verified installation rather than from an open punch list.

    Output

    • Commissioning plan and test records
    • SAT protocols and reports
    • System turnover packages and punch list
  5. Qualification

    Installation, Operational and Performance Qualification are executed to protocols agreed with your quality unit, with deviations raised, investigated and closed through the deviation and CAPA process. Qualification is run jointly with your QA and QC teams so the evidence belongs to the site from the day it is generated.

    Output

    • IQ, OQ and PQ protocols and reports
    • Deviation and CAPA records
    • Traceability matrix closure
  6. Handover and close-out

    The project closes with a complete, versioned and approved documentation set: as-builts, O&M manuals, training records, spare parts, certificates and the full qualification package, archived in a structure an auditor can navigate. Outstanding items are closed or formally transferred with an owner and a date.

    Output

    • As-built and O&M documentation
    • Training and handover records
    • Qualification package and close-out report

Technical parameters

How the project is controlled

The governance we apply by default. Reporting content and frequency are confirmed with the client at project setup.

Schedule and cost control

Schedule structureLevel 1 to Level 4, baselined and change-controlled
Progress measurementEarned Value Management — SPI and CPI reported against baseline
Critical path reviewWeekly, with float erosion and look-ahead reporting
Cost reportingMonthly — committed, incurred, forecast at completion and variance
Change controlFormal scope, cost and schedule impact assessment before approval

Risk and quality

Risk registerFMEA-based, live from feasibility through qualification, reviewed weekly
Quality managementISO 9001-aligned procedures, audits and non-conformance tracking
Inspection regimeInspection and Test Plan with defined hold, witness and review points
Vendor assuranceTechnical bid evaluation, drawing approval, FAT and SAT witness
Deviation handlingRaised, investigated, impact-assessed and closed with CAPA where required

Documentation and reporting

Document controlSingle controlled register, version and approval status on every issue
Client reportingWeekly progress summary and monthly report covering schedule, cost, earned value, risk, quality and HSE
Site recordsDaily site diary, inspection records, photographic record and NCR log
Handover packageIndexed, versioned and archived for client audit

Health, safety and environment

HSE frameworkISO 45001 and ISO 14001-aligned site management
Work controlPermit to work, method statements and task risk assessments
ReportingIncident, near-miss and observation reporting with corrective actions tracked to closure

Deliverables

What the project office produces

  • Project execution plan and governance structure
  • Work breakdown structure and baselined Level 1–4 schedule
  • Cost plan, cash-flow forecast and monthly cost report
  • RACI matrix and stakeholder communication plan
  • FMEA-based risk register with weekly review record
  • Procurement plan, tender packages and technical bid evaluations
  • Vendor document schedule and drawing approval register
  • Inspection and Test Plan with hold and witness points
  • HSE plan, permits, method statements and incident register
  • Commissioning plan, FAT and SAT protocols and reports
  • System turnover packages and punch list to closure
  • IQ, OQ and PQ protocols, reports and deviation records
  • As-built and O&M documentation, training records and spare parts register
  • Project close-out report and archived handover package

Compliance

Frameworks the project office runs on

PMI PMBOK GuideProject management governance
Stage-gate structure, WBS, earned value and change control practice.
ISO 9001Quality management systems
Procedures, audit, non-conformance and corrective action across the project.
ISO 45001 · ISO 14001Occupational health, safety and environmental management
Site HSE framework, permit to work and environmental controls.
EU GMP Annex 15Qualification and validation
The DQ, IQ, OQ and PQ program the delivery schedule is built around.
ASTM E2500Specification, design and verification of manufacturing systems
Risk- and science-based commissioning and qualification strategy.
ISPE C&Q Baseline GuideCommissioning and qualification
System classification, turnover packages and verification approach.
GAMP 5Compliant GxP computerized systems
Applied to the automation and SCADA scope within the delivery program.

Talk to our engineers

Tell us about your facility and we will route your inquiry to the right engineering lead.

Insights

Technical notes from this practice

  • On multi-contractor sites the decisions between scopes go unowned first: envelope penetrations, punch-list closure, construction cleanliness, interface as-builts and turnover sign-off. A RACI works when it names those decisions, with one accountable person each, and is reviewed whenever a scope changes.

    InsightRead

  • When RPN hides a severity 10 risk

    In an FMEA risk register, severity 10, occurrence 2 and detection 3 score an RPN of 60, below a nuisance risk at 100. Add a rule that any severity 9 or 10 comes to the weekly review whatever its RPN, and re-rate every risk after its mitigation.

    InsightRead

  • Project Management Consultancy

    A retention that pays for the turnover file

    Most of a cleanroom HVAC contract is paid before the turnover documents exist. Split the retention into two parts, released on acceptance of the turnover package and of the documents, and size the documentation part on what it would cost the owner to finish as-builts, calibrations and retests without the contractor.

    InsightRead

  • Project Management Consultancy

    A change-order log an owner can run

    Forty change orders at 0.5% each add up to a 20% overrun nobody approved. An owner's change log needs a pricing deadline written into the contract, signed approval of cost and time before work starts, and a running total on budget and completion date that the owner reads every week.

    InsightRead

  • Cleanroom panel changes after award: quoted or measured

    A layout change after award that adds cleanroom panel is a quoted variation under a lump sum, and a measured item at bill rates under a remeasurable contract. Equipment usually suits a lump sum; duct, pipe, cable and panel area suit measurement, with rules such as gross or net of doors agreed at tender.

    InsightRead

  • Project Management Consultancy

    A monthly project report in four pages

    An owner's monthly report needs four pages: schedule, cost, earned value and risk, each answering its question on the top line. Show forecast at completion, SPI and CPI trends with a review trigger agreed in advance, and the top FMEA risks with owners. Slipped long-lead items go on page one.

    InsightRead

View all insights (22)

Technical resources

Free references for this work

The references we reach for ourselves. No sign-up, and where a figure comes from a standard, we name it.

DQ, IQ, OQ, PQ reference

What each qualification stage proves, and what sends you back to it after handover.

Open the tool

Questions

Project Management Consultancy — questions we are asked

Answered by the engineers who do the work.

Under EPCM we manage engineering, procurement and construction on your behalf, and the trade contracts sit with you — you keep visibility of every price and every vendor, and change is transparent. A turnkey contractor carries the delivery risk but prices that risk into a single lump sum and controls the supply chain. For regulated facilities, where scope evolves as the process is defined, EPCM usually gives better cost control and a far better documentation trail.

Against a baselined Level 1–4 schedule using Earned Value. Schedule and cost performance indices are reported monthly with the underlying causes, and the critical path is reviewed weekly with a look-ahead and float position. Progress claimed on site has to be supported by inspection records, not by visual assessment.

Yes, and it is common. We begin with a constructability and compliance review of the existing package, identify gaps that would surface during commissioning or qualification, and agree how those are closed before construction reaches them. The review findings are issued in writing with cost and schedule impact.

You do. Qualification is executed jointly with your QA and QC teams, protocols are approved by your quality unit, and the executed package is handed over indexed and archived. We build the evidence; the site owns it.

Through formal change control. Nothing is instructed on site without an assessment of scope, cost, schedule and — critically — qualification impact. Changes are logged, priced and approved before work proceeds, and the schedule baseline is revised only through the same process.

It is reported in the cycle it appears in, with the cause, the forecast impact and the recovery options and their cost. Sequence changes, additional resource and rescoped work packages are all put forward as costed options. Concealing a slip to protect a report only moves the problem into commissioning, where it costs more.

Contractors remain responsible for the safety of their own work, and we manage the framework they operate inside — permits, method statements, risk assessments, inductions, inspections and incident reporting — with performance reported alongside cost and schedule.