Complex facility projects rarely fail on one decision. They drift — a vendor drawing approved late, a scope change absorbed without a schedule impact assessment, a qualification prerequisite discovered during commissioning. Each is small in isolation, and together they move a handover date by a quarter. Controls exist to make that drift measurable while there is still time to correct it.
We run projects on a stage-gate structure. Every gate has entry criteria, a defined deliverable and a named approver, and nothing passes on the basis that the next stage is already under pressure. Progress is measured with Earned Value against a baselined schedule and cost plan, so a variance is a number with a cause rather than a percentage someone estimated in a meeting.
The commercial and technical sides are managed together. Procurement is sequenced against the qualification program, so long-lead items with validation implications are ordered against approved specifications rather than provisional ones. Factory Acceptance Testing is treated as the point where an equipment problem is still the vendor's to fix, not the site's.
Regulatory outcome is a project deliverable in its own right. The qualification program is planned from the start, documentation is version-controlled throughout, and the handover pack is assembled as the project runs rather than reconstructed at the end. A project closes when the evidence is complete, not when the last contractor leaves site.