Skip to content

Technical resources

Engineering Tools & References

The references we reach for ourselves, published so you do not have to go looking for a copy of the standard to check one number.

Free to use

Reference, not marketing

No sign-up, nothing stored, and every figure carries the standard it comes from. If a tool here saves you opening a PDF, it has done its job.

Cleanroom classification reference

The full ISO 14644-1 table — every class, every particle size — with the EU GMP grade each one corresponds to at rest and in operation.

ISO 5 particle count · Grade B in operation · ISO 14644-1 limits

Open the tool

Air filter class reference

EN 1822 HEPA and ULPA classes with their efficiency at MPPS, and the ISO 16890 groups that protect them — two standards that measure different things.

H13 vs H14 · MPPS efficiency · ISO 16890 ePM1

Open the tool

DQ, IQ, OQ, PQ reference

What each qualification stage proves, what it needs before it can start, and what it hands over — plus what sends you back to it after handover.

difference between OQ and PQ · Annex 15 sequence · requalification interval

Open the tool

HVAC unit converter

Airflow, pressure, velocity, area, volume and temperature between metric and imperial. m³/h to CFM, Pa to inH₂O, m/s to fpm.

m3/h to CFM · Pa to inH2O · m/s to fpm

Open the tool

Air change rate calculator

Room volume to required airflow at a target air change rate, or the rate an existing supply actually delivers. Results in m³/h and CFM.

ACPH to m³/h · airflow from room volume · m³/h to CFM

Open the tool