ISO Coarse
Arrestance against coarse dust
First-stage protection for HVAC equipment; not rated against fine particulate.
Technical resources
Two standards that get confused because they measure different things. Here is what each one says, and where each class belongs. Reproduced for convenience — the standard itself governs.
EN 1822
Efficiency at the Most Penetrating Particle Size — the size the medium is worst at. Local efficiency is the minimum permitted at any single point on the filter face, which is what a leak scan looks for.
E10EPA
Final filtration in non-critical supply; pre-filtration to a HEPA stage.
E11EPA
Secondary filtration protecting terminal HEPA filters.
E12EPA
Higher-duty secondary filtration in cleanroom air handling.
H13HEPA
Terminal filtration for Grade C and D areas, and many ISO 7 and 8 rooms.
H14HEPA
Terminal filtration for EU GMP Grade A and B zones.
U15ULPA
Semiconductor and nanotechnology environments at ISO 1 to 4.
U16ULPA
The most critical fabrication zones.
U17ULPA
Specialist applications beyond normal cleanroom practice.
| Filter class | Group | Integral efficiency | Local minimum | Where it is used |
|---|---|---|---|---|
| E10 | EPA | ≥ 85 % | — | Final filtration in non-critical supply; pre-filtration to a HEPA stage. |
| E11 | EPA | ≥ 95 % | — | Secondary filtration protecting terminal HEPA filters. |
| E12 | EPA | ≥ 99.5 % | — | Higher-duty secondary filtration in cleanroom air handling. |
| H13 | HEPA | ≥ 99.95 % | ≥ 99.75 % | Terminal filtration for Grade C and D areas, and many ISO 7 and 8 rooms. |
| H14 | HEPA | ≥ 99.995 % | ≥ 99.975 % | Terminal filtration for EU GMP Grade A and B zones. |
| U15 | ULPA | ≥ 99.9995 % | ≥ 99.9975 % | Semiconductor and nanotechnology environments at ISO 1 to 4. |
| U16 | ULPA | ≥ 99.99995 % | ≥ 99.99975 % | The most critical fabrication zones. |
| U17 | ULPA | ≥ 99.999995 % | ≥ 99.9999 % | Specialist applications beyond normal cleanroom practice. |
A certificate proves the filter. It does not prove the installation — a certified filter in a poor seal still leaks, which is what the installed filter leak test on site exists to find.
ISO 16890
A different measure for a different job: how well a pre- or secondary filter removes the particulate fractions that would otherwise load the terminal filter behind it.
ISO Coarse
Arrestance against coarse dust
First-stage protection for HVAC equipment; not rated against fine particulate.
ISO ePM10
Efficiency against particles up to 10 µm
Pre-filtration where the outdoor air burden is largely coarse.
ISO ePM2.5
Efficiency against particles up to 2.5 µm
Intermediate filtration in cleanroom air handling units.
ISO ePM1
Efficiency against particles up to 1 µm
The stage that determines how long a terminal HEPA filter lasts.
Classes from EN 1822-1:2019. EN 1822-1 © CEN; ISO 16890 © ISO. Obtain the standards from iso.org or your national standards body.
Questions