HVAC & Cleanroom Unit Converter

Equipment schedules arrive in whichever unit the vendor's market uses, and the design was done in the other. This converts between them.

m³/h
1,000.0
CFM
588.6
L/s
277.8
m³/s
0.2778

1 m³/h = 0.588578 CFM · 1 CFM = 1.699011 m³/h

Questions

About these units

How do I convert m³/h to CFM?
Multiply cubic metres per hour by 0.588578 to get cubic feet per minute. Going the other way, multiply CFM by 1.699011. An air handling unit rated 10,000 m³/h is delivering about 5,886 CFM.
How many Pascals is one inch of water gauge?
249.0889 Pa at 4 °C, which is the reference condition HVAC datasheets use. So a 15 Pa room pressure differential is about 0.06 inH₂O, and a filter rated at 1 inH₂O final resistance is carrying roughly 249 Pa.
Why does Grade A airflow velocity get quoted in m/s?
Because EU GMP Annex 1 states it that way — 0.36 to 0.54 m/s at the working position. In imperial that is roughly 71 to 106 fpm, and equipment from a US supplier is often specified in fpm, which is where the conversion is needed.
Are these conversions exact?
The factors are the standard ones and are printed under each set so you can check them. Inches of water are referenced to 4 °C; a datasheet using 60 °F will differ in about the fourth significant figure, which never matters at the magnitudes used in ventilation.