We design the systems that decide whether a regulated facility performs and whether it can prove why: cleanroom HVAC and pressure cascades to ISO 14644, clean utilities and process piping, LV to MV power up to 22 kV, ELV, and automation compliant with 21 CFR Part 11 and Annex 11 — coordinated in BIM as one package rather than six that meet on site.

Services and Solutions

Introduction

The validation strategy, the User Requirement Specification and the DQ/IQ/OQ/PQ roadmap are written alongside the drawings rather than after them, so qualification protocols are drafted from documents that already exist. Energy is treated as a design decision at the same time: modeling and airflow simulation target a 30% reduction in HVAC consumption without moving a critical condition.

Overview

Design that carries the facility through its first audit

A regulated facility is judged twice: once on how it performs, and once on whether the record shows why it performs that way. We design for both from the first sketch.

Most of what decides whether a GMP facility passes inspection is fixed long before anyone pours concrete. Room adjacency decides whether personnel and material flows can be kept apart. The pressure regime decides which rooms hold their grade when a door opens. The air-handling architecture decides whether the building can be cleaned, recovered and requalified without shutting a production line. Change any of these after construction and the cost is counted in months, not line items.

Our design teams work across HVAC, cleanroom architecture, process and clean utilities, electrical power, ELV, automation and fire safety as one discipline rather than seven. A single design basis governs all of them, so the pressure cascade in the architectural layout, the airflow schedule in the HVAC model, the interlock logic in the control narrative and the alarm limits in the SCADA specification all describe the same building.

Every decision is written down with the reason behind it. The user requirement it satisfies, the standard it is measured against and the calculation that supports it stay traceable from the room data sheet through to the qualification protocol. When an inspector asks why a corridor is held 15 Pa above the adjacent airlock, the answer is in the design basis rather than in someone's memory.

We work greenfield and inside running plants. Retrofitting a validated facility carries its own constraints — the sequence of works, temporary containment, the requalification boundary and the impact assessment matter as much as the engineering — and the design is planned around holding the rest of the plant in its validated state throughout.

Capabilities

Scope of work

Multidisciplinary design that engineers performance, contamination control, and audit readiness into every facility.

Sustainable & Energy-Efficient HVAC

Advanced modeling and airflow simulation target a 30% reduction in HVAC energy consumption — through heat recovery, optimized air change rates, and psychrometric controls — without compromising critical conditions.

MEP, Electrical & SCADA Integration

Process piping and clean utilities (PW, WFI, Pure Steam), LV to MV power up to 22 kV, and 21 CFR Part 11 / Annex 11-compliant automation and SCADA on Rockwell, AVEVA, COPA-DATA, and Ignition.

Cleanroom & Contamination Control

GMP cleanrooms to EU GMP Grade A/B/C/D, classified to ISO 14644 — pressure cascades, directional airflow, and HEPA filtration that prevent cross-contamination across OSD, sterile, and biotech production.

Climate & Humidity Engineering

Specialized dehumidification and psychrometric design hold Grade A/B performance under extreme humidity and thermal variability, in any climate.

BIM-Coordinated Detailed Design

Fully BIM-coordinated packages resolve clashes before construction starts. Drawings, specifications, and construction documents give contractors a single, accurate source of truth.

Validation Strategy & Regulatory Support

Validation strategy, URS, and the qualification roadmap (DQ/IQ/OQ/PQ) developed in parallel with design — audit-ready for EU-GMP, WHO, US-FDA, and PIC/S.

Our approach

How a design package is built

Six stages, each closing on a document the next stage is built from. Nothing advances on a verbal agreement.

  1. Requirements and design basis

    We start from the process, not the building. Batch sizes, campaign patterns, containment category, cleaning regime, material and personnel movement, and the regulatory market the product is destined for all set constraints the facility has to absorb. These are captured in the User Requirement Specification and consolidated into a design basis that fixes the classification of every room, the environmental limits it must hold, and the standard each limit is drawn from.

    Output

    • User Requirement Specification
    • Design basis
    • Room classification schedule
  2. Concept design and feasibility

    Two or three layout options are developed far enough to be compared honestly — on flow separation, plant room location, duct routing, expansion headroom, construction sequence and indicative capital and energy cost. The comparison is quantified rather than argued, and the option carried forward is recorded together with the reasons the others were not.

    Output

    • Block layouts and flow diagrams
    • Quantified options comparison
    • Budget-level cost and energy estimate
  3. Basic design and FEED

    The selected concept is engineered until it can be priced and procured. Heat and moisture loads are calculated room by room, air volumes and change rates are set, the pressure cascade is modeled across every opening, plant is sized and selected, single-line diagrams and P&IDs are issued, and the control philosophy is written.

    Output

    • Load calculations and psychrometrics
    • Airflow and pressure schedules
    • P&IDs, single-line diagrams, control philosophy
    • Equipment schedules and specifications
  4. Detailed design and BIM coordination

    All disciplines are modeled in a federated BIM environment and clash-detected against architecture and structure before anything is released. Duct, pipe, cable containment and equipment access are resolved in the model, with maintenance clearance and filter-change access treated as design constraints rather than site problems. Construction drawings, schedules and specifications are issued from the coordinated model.

    Output

    • Federated BIM model and clash report
    • Issued-for-construction drawings
    • Room data sheets
    • Bill of quantities
  5. Design qualification and tender support

    Design Qualification demonstrates that the package satisfies the URS and the applicable regulations, with a traceability matrix linking each requirement to the drawing, specification or calculation that meets it. In parallel we prepare tender documents, evaluate bids on technical compliance rather than price alone, and review vendor drawings before fabrication starts.

    Output

    • DQ protocol and report
    • Requirement traceability matrix
    • Tender package and technical bid evaluation
  6. Construction support and design close-out

    Design intent has to survive the site. We review shop drawings, answer technical queries, assess proposed substitutions against the design basis, witness key installation stages, and control every change through formal change control. The package closes with as-built documentation that matches what was actually built.

    Output

    • Shop drawing and submittal reviews
    • Design change and deviation register
    • As-built drawings and design close-out report

Technical parameters

Design parameters we work to

The criteria below are drawn from the standards named beside them and from established design practice. Project values are fixed in the design basis and are tightened where the process demands it.

Cleanroom classification — ISO 14644-1 and EU GMP Annex 1

Grade A — ISO 5 at rest and in operation≤ 3,520 particles ≥ 0.5 µm per m³
Grade B — at rest ISO 5, in operation ISO 7≤ 3,520 at rest, ≤ 352,000 in operation, ≥ 0.5 µm per m³
Grade C — at rest ISO 7, in operation ISO 8≤ 352,000 at rest, ≤ 3,520,000 in operation, ≥ 0.5 µm per m³
Grade D — at rest ISO 8≤ 3,520,000 particles ≥ 0.5 µm per m³
Unidirectional airflow velocity, Grade A0.36 – 0.54 m/s at the working position
Recovery time, non-unidirectional roomsDesign target ≤ 20 minutes to classified condition

HVAC and environmental control

Air change rate, Grade B and C non-unidirectional roomsTypically 20 – 60 ACPH, set by calculated load and recovery requirement
Pressure differential between adjacent grades10 – 15 Pa, cascade direction fixed in the design basis
Room temperatureTypically 20 ± 2 °C, with process-driven set points where required
Relative humidityTypically 45 ± 10 % RH; ± 2 % RH achievable for moisture-sensitive processes
Terminal filtrationHEPA H13 ≥ 99.95 % or H14 ≥ 99.995 % at MPPS, tested to EN 1822
Air handling unit casingClassified to EN 1886 for leakage, deflection and thermal bridging

Clean utilities

Purified Water (PW)Conductivity ≤ 1.3 µS/cm at 25 °C (USP <645> Stage 1, tighter than the Ph. Eur. limit), TOC ≤ 500 ppb — meets Ph. Eur. and USP
Water for Injection (WFI)Ph. Eur. and USP WFI limits, hot- or cold-loop distribution with a defined sanitization regime
Pure steamCondensate meeting WFI limits; non-condensable gas, dryness and superheat tested to EN 285
Distribution piping316L stainless steel, orbital welded, fully drainable, with slope and dead-leg limits fixed at design
Compressed air and process gasesClassified to ISO 8573-1, with point-of-use filtration specified per application

Electrical, ELV and automation

Power distributionLow voltage through medium voltage up to 22 kV
Standby and uninterruptible supplyGenerator and UPS sized against the critical load schedule
Control platformsRockwell, Siemens, AVEVA, COPA-DATA zenon and Ignition
Electronic records and signaturesDesigned for 21 CFR Part 11 and EU GMP Annex 11
Software lifecycleGAMP 5 category assessment, specification and verification
ELV systemsAccess control, CCTV, public address, structured cabling and network infrastructure

Deliverables

What the design package contains

Issued as a controlled, versioned set that carries directly into qualification.

  • User Requirement Specification and design basis
  • Room classification schedule and room data sheets
  • Heat, moisture and airflow calculations with psychrometric analysis
  • Pressure cascade model and airflow schedules
  • Cleanroom architectural layouts, finishes schedule and flow diagrams
  • HVAC, plumbing, clean utility and process P&IDs
  • Electrical single-line diagrams, load schedules and cable calculations
  • Control philosophy, functional specification and alarm schedule
  • Federated BIM model with clash detection report
  • Equipment schedules, technical specifications and bill of quantities
  • Design Qualification protocol, report and requirement traceability matrix
  • Tender documentation and technical bid evaluation
  • As-built drawings and design close-out documentation

Compliance

Codes and guidelines applied

ISO 14644Cleanrooms and associated controlled environments
Classification, monitoring, test methods, design and construction, and the assessment of equipment suitability in Part 14.
EU GMP Annex 1Manufacture of sterile medicinal products
Contamination Control Strategy, grade definitions, airflow visualization and environmental monitoring.
EU GMP Annex 11 · 21 CFR Part 11Computerized systems and electronic records
Access control, audit trail, electronic signature and data integrity requirements for SCADA and EBR.
EU GMP Annex 15Qualification and validation
The DQ, IQ, OQ and PQ framework the design package is written to support.
WHO TRS · PIC/S PE 009GMP guidance for medicinal products
Applied where the product is intended for WHO prequalification or for PIC/S member markets.
GAMP 5Risk-based approach to compliant GxP computerized systems
Software categorization, specification and verification strategy for automation.
EN 1886 · EN 1822Air handling units and HEPA/ULPA filters
Casing classification and filter efficiency at the most penetrating particle size (MPPS).
ISPE Baseline GuidesIndustry practice for facility and HVAC design
Used alongside the regulations for design approach and commissioning strategy.

Talk to our engineers

Tell us about your facility and we will route your inquiry to the right engineering lead.

Insights

Technical notes from this practice

  • Compare deliverable lists before you compare totals

    Two engineering proposals with similar totals can cover very different scopes. Before comparing prices, check that each deliverable list names Room Data Sheets, the pressure cascade and airflow balance, the URS and qualification protocols, the FAT and equipment file, and an asset register behind maintenance response times.

    InsightRead

  • Before changing an inherited facility or design, a written gap assessment against the URS and target regulations gives management and inspectors the same picture: evidence from documents and spot measurements, findings graded by risk, and the fix, cost range and schedule impact of each, plus what can stay.

    InsightRead

  • Engineering Solution & Consultancy

    Tender what the design already selected

    When bidders select equipment after issue, coil and fan sizes are set under price pressure and every bid prices a different unit. Selecting against calculated loads during design means the tender describes buildable equipment at the budgeted price. Specify performance plus a reference selection, and accept tested equals.

    InsightRead

  • Trend the pressure cascade, don't just alarm it

    The typical differential between adjacent grades is 10–15 Pa, and alarms catch only the failure. A room pair drifting from 14 to 11 Pa has not alarmed, yet something changed. Plot the daily median of each differential against its commissioned value and review it weekly.

    InsightRead

  • Read Annex 1 clause by clause before the inspection date

    A Grade B room never retested for recovery after a ductwork change is an easy inspection finding, and six months earlier it is ordinary planned work. A written review reads Annex 1 clause by clause and gives each gap one row: clause, current state, risk, fix and rough size, finished before an inspection date is set.

    InsightRead

  • Changing from WHO-GMP to EU-GMP midway through design reopens the URS, validation master plan, DQ and drafted IQ/OQ protocols, and for sterile products the Annex 1 CCS. The market is one of five scoping questions, with the process, grades and room list, existing assets and the division needed first.

    InsightRead

  • Resident design engineer or RFIs by email

    Most site questions on a GMP project are small, but each needs someone with design authority. A resident design engineer can answer the same morning, for a monthly fee and with written signing limits; emailed RFIs are cheaper and take days. Resident cover pays during dense MEP installation, and a tracked RFI log covers the rest.

    InsightRead

  • Four checks at the basic-design gate

    Before detail design opens, a GMP project should have frozen room data sheets and pressure cascade, loads that match the equipment list, a URS for each critical system and owned open items. A cascade change after the ducts are drawn reaches the duct sizes, terminal filters, AHU selection and every neighbouring pressure step.

    InsightRead

  • Calibration dates and the commissioning program

    A calibration certificate that expires partway through air balancing leaves the later readings without a traceable instrument at OQ review. Before commissioning, list every instrument that will produce a qualification reading, check each due date against the whole test window plus slippage, and record the serial on every test sheet.

    InsightRead

View all insights (55)

Technical resources

Free references for this work

The references we reach for ourselves. No sign-up, and where a figure comes from a standard, we name it.

Air change rate calculator

Room volume to required airflow, or the rate an existing supply delivers. In m³/h and CFM.

Open the tool

HVAC unit converter

Airflow, pressure and velocity between metric and imperial units: m³/h to CFM, Pa to inH₂O.

Open the tool

Questions

Engineering Solution & Consultancy — questions we are asked

Answered by the engineers who do the work.

Before the layout is fixed. Room adjacency, flow separation, plant room location and the pressure regime determine whether a facility can hold its classification, and they are the most expensive things to change once construction has started. The feasibility or concept stage is where design has the most leverage.

Yes. We take on packages at any stage, starting with a gap assessment against the User Requirement Specification and the applicable regulations. The assessment states what is compliant, what is missing and what has to change, with the cost and schedule impact of each item given before work continues.

The validation strategy and qualification roadmap are written in parallel with the design, not after it. Design Qualification demonstrates that the package satisfies the URS, and a traceability matrix links every requirement to the drawing, calculation or specification that meets it — so qualification protocols are drafted from documents that already exist.

Yes. The design basis records the regulatory market the facility is built for, and where a product is destined for several markets the most demanding requirement governs. We work to EU-GMP, US-FDA cGMP, WHO-GMP and PIC/S expectations, and design for the ASEAN and Asia-Pacific climate conditions that drive dehumidification and plant sizing.

Through written change control and impact assessment. The requalification boundary is defined before work starts, temporary containment and the sequence of works are designed so surrounding areas stay in their validated state, and affected systems are requalified against protocols agreed with your quality unit.

On every project with meaningful services congestion. The federated model is where clashes are resolved, maintenance access is proven and construction sequence is tested, and construction drawings are issued from it. On a small retrofit a 2D coordinated package is sometimes the proportionate answer, and we will say so.

By reducing demand before optimizing plant. Recirculation strategy, air change rates set by calculated load and recovery requirement rather than rule of thumb, heat recovery, demand-controlled ventilation in unoccupied periods and variable speed plant all cut consumption while the classified condition holds. Every measure is checked against the recovery-time and pressure-cascade requirement before it is adopted.

The process description, the product and the market it serves, indicative capacities, the site or building envelope, and any existing drawings. Where a User Requirement Specification does not yet exist, writing it is the first stage of the work.