Skip to content

Get in touch

Contact

Two offices, one engineering team. Tell us about your facility and we will route your inquiry to the right lead.

Send us your requirement

Headquarters

1548 S Gladys Ave, San Gabriel, CA 91776, USA

Monday – Friday, 8:00 AM – 5:00 PM (Pacific Time)

Viet Nam office

175 Phan Chu Trinh, Binh Loi Trung Ward, HCMC

Monday – Saturday, 8:00 AM – 5:00 PM (GMT+7)

Phone (Viet Nam office)

+84 28 7777 6668

Monday – Saturday, 8:00 AM – 5:00 PM (GMT+7)

Consultation

Send us your requirement

Consultation information

Tell us about your facility and we will route your inquiry to the right engineering lead.

We use these details only to answer your inquiry. Privacy Policy

Reach us directly

  • Headquarters1548 S Gladys Ave, San Gabriel, CA 91776, USA
  • Viet Nam office175 Phan Chu Trinh, Binh Loi Trung Ward, HCMC
  • contact@humiley.com
  • +84 28 7777 6668(Viet Nam office)
  • Monday – Friday, 8:00 AM – 5:00 PM (Pacific Time) (Headquarters)
  • Monday – Saturday, 8:00 AM – 5:00 PM (GMT+7) (Viet Nam office)

Headquarters

1548 S Gladys Ave, San Gabriel, CA 91776, USA

Showing the map connects your browser to Google.

Open in Google Maps

Viet Nam office

175 Phan Chu Trinh, Binh Loi Trung Ward, HCMC

Showing the map connects your browser to Google.

Open in Google Maps

Getting in touch

Start with the problem

Tell us what you are trying to build or fix. An engineer will answer, not a form.

Most useful conversations start with a problem rather than a product inquiry — a facility that will not hold humidity through the wet season, a design that needs a second opinion before it is committed, an inspection finding that needs an engineering answer, or a plant nobody has maintained to a plan for three years. Any of those is a reasonable first message.

Useful detail

What helps us answer quickly

None of these is required, but any one of them lets us give you something useful in the first reply rather than the third.

  • What the facility makes, or is intended to make, and for which regulatory market
  • Whether this is a new build, an expansion, a retrofit in a live plant, or an operating facility needing support
  • The stage you are at — an idea, a feasibility study, an issued design, a project under construction, or a facility already running
  • Anything already drawn or written: a brief, a URS, layouts, or a previous consultant's report
  • The date that actually matters, and what happens if it moves

What happens next

What happens next

  1. We read it and route it

    Your message goes to the discipline it belongs to rather than into a general inbox. If it is genuinely not our field we will say so and, where we can, point you at someone whose field it is.

  2. An engineer replies

    The first reply comes from someone who can discuss the technical content, and usually contains either an initial view or the two or three questions we need answered to form one.

  3. A call or a visit

    For anything beyond a straightforward supply inquiry, a conversation saves several rounds of email. For an existing facility, a site visit is normally worth more than any amount of correspondence.

  4. Something in writing

    A scope and deliverable list, an assessment proposal, or a quotation against a specification — so what you are buying is written down before anyone commits to it.

Questions

Before you write

No. An initial conversation, and forming a view on whether we are the right people for the work, costs you nothing. Chargeable work starts when there is a written scope and you have agreed to it.

Either — inquiries are routed internally. In practice the Viet Nam office handles engineering, delivery and service across Southeast Asia, and the United States headquarters handles corporate and commercial matters and US-market work.

If your site is under a maintenance agreement with us, use the duty contact named in that agreement. Otherwise call during Viet Nam office hours, Monday to Saturday, 8:00 AM to 5:00 PM (GMT+7), or email us at any time: we will tell you honestly whether we can help within your timescale.

Yes, and for most process discussions it is sensible. Send yours or ask for ours; it does not need to delay a first conversation about whether the work is a fit.