Headquarters
1548 S Gladys Ave, San Gabriel, CA 91776, USA
Monday – Friday, 8:00 AM – 5:00 PM (Pacific Time)
Get in touch
Two offices, one engineering team. Tell us about your facility and we will route your inquiry to the right lead.
1548 S Gladys Ave, San Gabriel, CA 91776, USA
Monday – Friday, 8:00 AM – 5:00 PM (Pacific Time)
175 Phan Chu Trinh, Binh Loi Trung Ward, HCMC
Monday – Saturday, 8:00 AM – 5:00 PM (GMT+7)
Monday – Saturday, 8:00 AM – 5:00 PM (GMT+7)
Consultation
We have received your message and will reply to the email address you gave us.
Expected reply time: one working day
Please fill in your name, email address and message. Email us at contact@humiley.com instead.
That email address does not look right. Please check it. Email us at contact@humiley.com instead.
That is a lot of inquiries at once. Please try again shortly. Email us at contact@humiley.com instead.
Headquarters
1548 S Gladys Ave, San Gabriel, CA 91776, USA
Showing the map connects your browser to Google.
Viet Nam office
175 Phan Chu Trinh, Binh Loi Trung Ward, HCMC
Showing the map connects your browser to Google.
Getting in touch
Tell us what you are trying to build or fix. An engineer will answer, not a form.
Most useful conversations start with a problem rather than a product inquiry — a facility that will not hold humidity through the wet season, a design that needs a second opinion before it is committed, an inspection finding that needs an engineering answer, or a plant nobody has maintained to a plan for three years. Any of those is a reasonable first message.
Useful detail
None of these is required, but any one of them lets us give you something useful in the first reply rather than the third.
What happens next
Your message goes to the discipline it belongs to rather than into a general inbox. If it is genuinely not our field we will say so and, where we can, point you at someone whose field it is.
The first reply comes from someone who can discuss the technical content, and usually contains either an initial view or the two or three questions we need answered to form one.
For anything beyond a straightforward supply inquiry, a conversation saves several rounds of email. For an existing facility, a site visit is normally worth more than any amount of correspondence.
A scope and deliverable list, an assessment proposal, or a quotation against a specification — so what you are buying is written down before anyone commits to it.
Questions
No. An initial conversation, and forming a view on whether we are the right people for the work, costs you nothing. Chargeable work starts when there is a written scope and you have agreed to it.
Either — inquiries are routed internally. In practice the Viet Nam office handles engineering, delivery and service across Southeast Asia, and the United States headquarters handles corporate and commercial matters and US-market work.
If your site is under a maintenance agreement with us, use the duty contact named in that agreement. Otherwise call during Viet Nam office hours, Monday to Saturday, 8:00 AM to 5:00 PM (GMT+7), or email us at any time: we will tell you honestly whether we can help within your timescale.
Yes, and for most process discussions it is sensible. Send yours or ask for ours; it does not need to delay a first conversation about whether the work is a fit.