About Humiley
Humiley delivers Project Management Consultancy (PMC) and turnkey solutions for Pharmaceutical & Life Sciences industries, helping launch GMP-compliant facilities on time and audit-ready
The role
Lead PMC supervision of all Civil, Structural, Architectural and Finishing works for a pharmaceutical manufacturing facility — from foundations and superstructure to cleanroom shell, raised floors, epoxy systems and façade — ensuring that the built environment provides a safe, durable and EU-GMP-compatible envelope for downstream MEP, Cleanroom and Process packages.
Position Snapshot
Job Title: Civil / Structural Engineer – PMC Department: Project Management Consultancy – PMO Reports To: PMC Project Manager/Construction Manager Location: Project Site, Viet Nam/Southeast Asia
Type: Full-time, Site-based
Grade: Engineer / Senior Engineer Headcount: 01 (open until filled) Code: HML-JD-PMC-007 · Rev 01.0
Key Responsibilities
- Design Review: Review and verify civil & structural design deliverables — soil reports, foundation calculations, RC drawings, steel-structure shop drawings — against Vietnamese codes (TCVN) and international standards (Eurocode, ACI, AISC).
- Construction Supervision: Supervise daily construction activities: earthworks, piling, formwork, rebar, concrete pouring, structural steel erection, masonry, waterproofing, roofing and façade installation.
- Materials & Traceability: Witness material acceptance tests (concrete cube, rebar tensile, soil compaction, weld NDE) and verify mill certificates and supplier traceability.
- Cross-Discipline Coordination: Coordinate civil interfaces with MEP, Cleanroom, Architectural and Process Equipment teams — embeds, openings, anchor bolts, equipment pads, plinths and prefabricated cleanroom panels.
- Schedule & Quality Control: Drive contractor schedule and quality: maintain inspection logs, issue NCRs, manage punch list and ensure timely closure of defects before MEP overlay.
- HSE Leadership: Champion site HSE, including scaffolding, fall protection, lifting plans, hot-work permits, confined-space entry and emergency response.
- GMP Finish Verification: Verify GMP-relevant finishes: coved floors, FRP/Epoxy wall systems, sealed penetrations, walkable ceilings and pressure resistance of the cleanroom envelope; maintain total-station survey records and handover dossiers in line with EU-GMP documentation requirements.
- Geotechnical Monitoring: Interpret geotechnical investigation reports (SPT, CPT, plate load tests) and settlement-monitoring data, and recommend remedial actions when actuals differ from design assumptions.
- Temporary Works Oversight: Coordinate temporary works (shoring, dewatering, formwork systems) and crane / heavy-lift studies; review method statements and risk assessments prior to execution.
Who We Are Looking For
- Bachelor of Engineering in Civil / Structural / Construction Engineering; postgraduate qualification preferred.
- Minimum 5 years of site experience on industrial, pharmaceutical or cleanroom projects. Familiar with Viet Nam Construction Law, TCVN suite and at least one international code (Eurocode / ACI / AISC).
- Proficient in AutoCAD, Revit Structure, Tekla, ETABS / SAP2000, MS Project / P6.
Competencies
Technical: Foundation engineering (piled and raft/mat) and settlement control. Reinforced concrete and structural steel construction supervision. Cleanroom shell, walkable ceilings and vibration-isolated equipment foundations. Quality control of finishes, waterproofing and epoxy/PU flooring. Behavioral: Safety-first, zero-accident mindset. Hands-on, problem-solving site presence. Strong cross-discipline coordination. Quality- and dimension-conscious.
Why Join Humiley
- High-Impact Projects: Work on pharmaceutical facilities that meet EU-GMP, WHO-GMP, and PIC/S standards, alongside senior engineers trained in the US, EU, and Viet Nam.
- Empowered Culture: Thrive in a flat, evidence-driven organization where your technical opinion is valued from Day 1, and decisions are made based on data, not seniority.
- Global Interaction: Engage directly with major international clients from the US, EU, and Japan, and gain firsthand experience hosting inspections from top-tier global auditors.
- Professional Mastery: Access Humiley-sponsored international certifications (PMP, FIDIC, GAMP 5, ISPE, BICSI) with fully covered exam fees and paid study leave.
- Modern Flexibility: Benefit from a hybrid working model and a "Family-First" mindset that balances site-based delivery with remote design and reporting phases.
Career Path & First 90 Days
Clear progression path with semiannual reviews. The initial 90 days focus on onboarding, taking ownership of site scope, and leading processes.
What We Offer
- Competitive Salary: Highly attractive base salary benchmarked to the upper quartile of the market, with a range of up to 1300 USD per month.
- Bonuses: Guaranteed 13th-month salary plus performance and project-completion bonuses (typically 1–3 months of base salary per project).
- Comprehensive Care: Premium healthcare package for employee, spouse, and children, plus full statutory insurance (SHUI).
- Workplace Benefits: Site allowance, overtime/meal allowance, and full reimbursement for all business travel.
- Professional Growth: 20 days annual leave and a dedicated budget for international certifications, including paid study leave and exam fees.
Send your CV (PDF, English preferred) together with a one-page cover note to careers@humiley.com.

