Skip to content

Careers

Electrical Engineer – PMC, Pharmaceutical Manufacturing

  • Full-time, Site-based
  • Up to 1100 USD
  • Viet Nam

About Humiley

Humiley delivers Project Management Consultancy (PMC) and turnkey solutions for the pharmaceutical and Life Sciences industries, helping launch GMP-compliant facilities on time and audit-ready.

The Role

Provide on-site PMC oversight of all electrical packages — from utility intake and MV/LV distribution to lighting, small power, earthing, UPS and standby generation — ensuring that power systems serving the GMP plant are installed safely, reliably and in full compliance with the IEC suite, local regulations and the project specifications.

Position Snapshot

Job Title: Electrical Engineer – PMC

Department: Project Management Consultancy – PMO

Reports To: PMC Project Manager/Lead MEP Engineer

Location: Project Site, Viet Nam/Southeast Asia

Type: Full-time, Site-based

Grade: Engineer / Senior Engineer

Headcount: 01 (open until filled)

Key Responsibilities

  • Review electrical design deliverables — single-line diagrams, load schedules, short-circuit and protection coordination studies, cable schedules and lighting calculations.
  • Supervise the installation of MV/LV switchgear, transformers, MCC, distribution boards, busways, cable trays, lighting and small-power systems.
  • Witness Factory & Site Acceptance Tests for switchgear, transformers, UPS, ATS and DG sets; verify test reports against IEC 61439, 60076, 62040 and 60947.
  • Verify earthing, equipotential bonding and lightning protection in accordance with IEC 62305 and TCVN; sign off on continuity, insulation and earth-loop test records.
  • Coordinate interfaces with HVAC, Automation, ELC, Process Utilities and Civil packages, resolving design clashes and managing the cable-route master plan.
  • Monitor contractor progress and quality; issue daily reports, NCRs and punch-list items; drive timely closure and escalate risks to the PMC Project Manager.
  • Support energization, hot-commissioning and the C&Q lifecycle, including IQ/OQ for electrical systems serving GMP areas.
  • Champion electrical safety, LOTO (Lock-Out/Tag-Out), arc-flash assessment (IEEE 1584), live-line work permits and energy efficiency throughout construction and energization.
  • Verify power-quality, harmonic profile (THDi/THDv), power-factor correction and load balancing using on-site analyzers; coordinate with BMS for energy-KPI dashboards.
  • Interface daily with Civil (cable trench / earth grid), HVAC (motor starters / VFD), Automation (BMS / SCADA), ELC (life-safety integration) and Process Utility teams.

Who We Are Looking For

  • Bachelor of Engineering in Electrical / Power Systems / Electrical & Electronics Engineering.
  • Minimum 5 years of site experience on industrial or pharmaceutical projects with proven exposure to MV (≥ 22 kV) and LV (400 V) distribution.
  • Hands-on knowledge of IEC 60364, IEC 61439, IEC 62305, IEEE 519, NFPA 70 (NEC) and TCVN 7447/QCVN 12 electrical codes.
  • Proficiency in AutoCAD Electrical, Revit MEP, ETAP / DIgSILENT / EasyPower, DIALux / Relux and MS Project / Primavera P6.
  • Viet Nam Class-3 Electrical Practitioner License (or an equivalent international credential — IET CEng or a US PE license) is preferred.

Competencies

  • Technical: MV/LV distribution architecture, protection grading (Time-Current Curves) and selectivity studies. Earthing (TT/TN-S/IT), EMC and lightning protection design (IEC 62305 Levels I–IV). UPS (online double-conversion), ATS, diesel generators with synchronization, harmonic mitigation and active filtering. GMP electrical zoning (clean / dirty utilities), uninterruptible critical-load supply, BMS interface and computerized system validation (CSV) readiness. Industrial lighting design (lux levels 200–1000), DALI control, emergency & exit-sign systems compliant with QCVN 06 and NFPA 101.
  • Behavioral: Disciplined, safety-first mindset. Analytical and decisive in resolving site issues. Strong stakeholder communication in EN/VN. Continuous-improvement orientation.

Why Join Humiley

  • High-Impact Projects: Work on pharmaceutical facilities built to EU-GMP, WHO-GMP, and PIC/S requirements alongside senior engineers trained in the US, EU, and Viet Nam.
  • Empowered Culture: Thrive in a flat, evidence-driven organization where your technical opinion is valued from Day 1, and decisions are made based on data, not seniority.
  • Global Interaction: Engage directly with major international clients from the US, EU, and Japan, and gain firsthand experience hosting inspections from top-tier global auditors.
  • Professional Mastery: Access Humiley-sponsored international certifications (PMP, FIDIC, GAMP 5, ISPE, BICSI) with fully covered exam fees and paid study leave.
  • Modern Flexibility: Benefit from a hybrid working model and a "Family-First" mindset that balances site-based delivery with remote design and reporting phases.

Career Path & First 90 Days

Clear progression path with semiannual reviews. The initial 90 days focus on onboarding, taking ownership of site scope, and leading processes.

What We Offer

  • Competitive Salary: Highly attractive base salary benchmarked to the upper quartile of the market, with a range of up to 1100 USD per month.
  • Bonuses: guaranteed 13th-month salary plus performance and project-completion bonuses (typically 1–3 months of base salary per project).
  • Comprehensive Care: Premium healthcare package for employee, spouse, and children, plus full statutory insurance (SHUI).
  • Workplace Benefits: Site allowance, overtime/meal allowance, and full reimbursement for all business travel.
  • Professional Growth: 20 days annual leave and a dedicated budget for international certifications, including paid study leave and exam fees.

Send your CV (PDF, English preferred) together with a one-page cover note to careers@humiley.com.