Skip to content

Careers

QS Engineer – PMC, Pharmaceutical Manufacturing

  • Full-time
  • Up to 600 USD
  • Viet Nam

About Humiley

Humiley delivers Project Management Consultancy (PMC) and turnkey solutions for the pharmaceutical and Life Sciences industries, helping clients launch GMP-compliant facilities on time and audit-ready.

The role

Own the commercial governance of all PMC-managed packages — Civil, MEP, Cleanroom, Utilities and Production Equipment — by safeguarding budget, validating quantities, certifying payments, controlling variations and providing transparent cost-and-cash visibility to the Client throughout the project lifecycle.

Position Snapshot

Job Title: Quantity Surveyor (QS) Engineer – PMC

Department: Project Management Consultancy – Commercial

Reports To: PMC Commercial Manager/Project Manager

Location: Project Site, Viet Nam/Southeast Asia

Type: Full-time

Grade: QS Engineer / Senior QS

Headcount: 01 (open until filled)

Key Responsibilities

  • Cost Planning & Reporting: Develop and maintain the project cost plan, cash-flow forecast and contingency register; report variances against budget on a monthly basis.
  • Quantity Verification: Verify Bills of Quantities (BOQ), measure works on site and reconcile contractor claims against the contract and as-built records.
  • Commercial Negotiation: Evaluate variation orders, change requests and claims; negotiate fair commercial settlements aligned with the FIDIC or Viet Nam Civil Code contract framework.
  • Payment Certification: Issue interim and final payment certificates with full supporting documentation and audit trail.
  • Procurement Support: Lead procurement support: pre-qualification, tender preparation, bid evaluation, commercial clarification and contract award recommendation.
  • Risk Management: Maintain the risk register from a commercial perspective; quantify exposures and recommend mitigation.
  • Subcontract Close-out: Close out subcontracts, including final account, retention release, defects liability tracking and lessons-learned register.
  • Ethical Practices: Champion ethical procurement and anti-bribery practices in line with Humiley and Client compliance policies; maintain auditable trails for every cost decision. Reconcile model quantities against drawing take-offs and resolve discrepancies with the Design team.
  • Benchmarking & Sourcing: Benchmark supplier quotations against regional pharma project databases; recommend make-or-buy decisions for cleanroom panels, AHUs, switchgear and process piping.

Who We Are Looking For

  • Bachelor's degree in Construction Economics, Civil Engineering, Quantity Surveying or equivalent; Master's degree in Construction Cost Management preferred.
  • Minimum 5 years of QS experience on industrial, pharmaceutical or cleanroom projects, with at least one project under a FIDIC contract.
  • Familiar with FIDIC Red/Yellow/Silver Books, Viet Nam Construction Law 50/2014/QH13 and Decree 10/2021/ND-CP cost framework.
  • Strong command of MS Excel (advanced), Power BI, CostX / Cubicost / Bluebeam, Glodon and ERP cost modules (SAP S/4HANA, Oracle).
  • RICS, AIQS, CIOB or Viet Nam Class-2 Quantity Surveyor certification is a strong advantage.

Competencies

  • Technical: Pharma-specific cost benchmarks (cleanroom $/m², MEP %, validation cost ratios). Earned Value Management (PV, EV, AC, CPI, SPI). Contract administration, claims, dispute avoidance. Take-off automation using 2D/BIM models.
  • Behavioral: Integrity and commercial discretion. Numerate, methodical and audit-ready. Negotiation and influencing skills. Clear reporting in EN/VN.

Why Join Humiley

  • High-Impact Projects: Work on landmark EU-GMP, WHO-GMP, and PIC/S pharmaceutical facilities alongside a world-class team of US-, EU-, and Viet Nam-trained senior engineers.
  • Global Interaction: Engage directly with major international clients from the US, EU, and Japan, and gain firsthand experience supporting regulatory inspections and client audits.
  • Empowered Culture: Thrive in a flat, evidence-driven organization where your technical opinion is valued from Day 1, and decisions are made based on data, not seniority.
  • Professional Mastery: Access Humiley-sponsored international certifications and training (PMP, FIDIC, GAMP 5, ISPE, BICSI) with fully covered exam fees and paid study leave.
  • Modern Flexibility: Benefit from a hybrid working model and a "Family-First" mindset that balances site-based delivery with remote design and reporting phases.

Career Path & First 90 Days

Clear progression path with semiannual reviews. The first 90 days focus on onboarding, taking ownership of site scope, and leading processes.

What We Offer

  • Competitive Salary: Base salary benchmarked against the market, with a range of up to 600 USD per month.
  • Bonuses: 13th-month salary plus performance and project-completion bonuses (typically 1–3 months of base salary per project).
  • Comprehensive Care: Premium healthcare package for employee, spouse, and children, plus full statutory insurance (SHUI).
  • Workplace Benefits: Site allowance, overtime/meal allowance, and full reimbursement for all business travel.
  • Time Off & Development: 20 days of annual leave and a dedicated budget for international certifications, including paid study leave and exam fees.

Send your CV (PDF, English preferred) together with a one-page cover letter to careers@humiley.com.