Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Maintenance Service

Maintenance Service

4 articles tagged #Cleanroom.

Design sensors so they can be calibrated in place

A pressure transmitter above a sealed ceiling with no test connection, a duct probe fixed out of reach, a pipe sensor with no second pocket: each turns calibration into a shutdown or a scaffold job. Test tees with isolating valves, removable probes and spare thermowells cost little on the installation details and save years of postponed calibrations.

InsightRead