
Filter gauge ranges: read the change point, not the bottom of the dial
A pre-filter changed at 150 Pa on a 0–1,000 Pa gauge sits in the bottom 15% of the dial with about 20 Pa of uncertainty. A 0–250 Pa gauge puts it at 60% with 5 Pa. Range each stage's gauge and transmitter to its own change point.
InsightRead

