
Containment exhaust fans, stacks and intakes
Put containment exhaust fans at the end of the run so ducts inside the building stay negative. Run duty and standby with isolation dampers and alarmed changeover, discharge vertically with height and velocity from a standard or a dispersion study, and keep the plume away from fresh-air intakes.
InsightRead

