Containment exhaust fans, stacks and intakes

  • Manufacturing & Distribution
  • 1 min read

An exhaust fan at the end of the run keeps every duct joint before it under negative pressure, so a leak draws air in, not dust out.

In a potent-compound suite the HEPA housing gets most of the attention. The fan and stack decide what happens to anything that passes the filter, and to the room when the fan stops.

  1. Fan position. At the end of the run, ideally on the roof or outside the occupied building. A fan halfway along puts its discharge duct under positive pressure inside the building.
  2. Redundancy. For a room that must stay negative, one fan is a single point of failure. Duty and standby fans with automatic changeover on a flow or pressure signal, each with an isolation damper so air does not short-circuit through the stopped one, and an alarm on every changeover.
  3. Stack height and exit velocity. A vertical discharge, high and fast enough to clear the building's wake, with no rain cap turning the plume back down. The values come from a standard or a dispersion study.
  4. Distance from intakes. Fresh-air intakes, a neighbour's included, kept upwind of the stack in the prevailing wind. A plume that re-enters through an AHU intake has bypassed every barrier in the building.

Then decide and test what the room does on a total power loss.

Our engineering covers high-potency and containment suites, from the HVAC design to the roof.

Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)

Related

More on this subject

EU GMP Chapter 3 and 21 CFR 211 on HVAC

21 CFR 211.42 and 211.46 and EU GMP Chapter 3 ask for adequate ventilation, air control and filtration, but give no air change rate or pressure differential, and no filter class beyond HEPA for aseptic areas. Those come from Annex 1, FDA's 2004 aseptic guidance, ISO 14644 and the designer's justification, recorded in the design basis.

InsightRead

Four checks at the basic-design gate

Before detail design opens, a GMP project should have frozen room data sheets and pressure cascade, loads that match the equipment list, a URS for each critical system and owned open items. A cascade change after the ducts are drawn reaches the duct sizes, terminal filters, AHU selection and every neighbouring pressure step.

InsightRead