
Low delta-T: 5 K on the drawing, 3 K in the plant
When a chilled water plant designed for 5 K runs at 3 K, it needs about 67% more flow for the same load and stages chillers early. The usual causes are at the coils: three-way valves, fouling and low setpoints. Fix the coils and trend ΔT on the BMS.
InsightRead

