
The handover is where GMP projects lose money
Designer, supplier, contractor and maintenance team each hold part of a facility's design intent, and assumptions get lost at every boundary. Humiley works as four divisions on one design basis, so the drawing, the factory acceptance test and the maintenance plan all trace back to the same requirements.
Read

