Say the last three fan selections you did all came back from the checker with a red mark on the same line, the filter pressure drop.
Each calculation used the initial figure, the pressure drop across clean filters. The fan has to deliver its airflow when those filters are loaded and due for change, so the checker swapped in the final pressure drop from the specification, and each time the duty point moved up the fan curve.
Those three pages are the most useful thing to carry into a performance review. Humiley engineers have a PADR twice a year, alongside a skills matrix and an Individual Improvement Plan, and a reviewer can read marked-up work in a way they cannot read a list of projects. They can see the same correction made three times and check whether the fourth calculation got it right.
The pattern also points at something narrower than the matrix row it sits under: how a filter's pressure drop changes over its life. That is a small, specific item to ask for in your next IP, with a senior engineer checking the next selection you make.

