The wet-season coil and how we train engineers

  • Careers
  • 1 min read

A fresh-air coil selected for a hot, dry afternoon shows up in the first wet season as a room drifting above its humidity limit.

The humid rainy-season hours were the design case. The peak dry-bulb day and the peak moisture day are different days, and a dehumidifying coil has to be checked against both. The load sheet does not flag it. Someone has to know to ask which weather condition the selection used, and most engineers learn that from a person who has already watched the humidity trend climb on a working plant.

That is why I care about how we train. Engineers in Viet Nam who already know GMP HVAC, clean utilities and validation are few, so Humiley builds its engineering department from fresh graduates. Our 12-month structured internship took more than 20 interns in its first year, and the training runs alongside on-the-job mentoring by senior leads, on live design work where a coil selection is still open to change.

Our Vision 2030 is to be the partner clients bring in when a facility has to pass inspection the first time. Much of what an inspector later finds was settled at a design desk, by an engineer who either asked about the wet-season condition or did not.

Engineering students who want to learn this trade: the internship and the path from junior to lead are described on our careers page.

Tony Nguyen, CEO

Related

More on this subject

Why we grow our own cleanroom engineers

More than 20 interns joined Humiley's 12-month structured internship in its first year. Training designed with lead engineers from the USA covers fundamentals, on-the-job mentoring, GMP, validation and project management, with a skills matrix and improvement plan for every engineer from junior to lead.