Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

15 articles tagged #ElectricalPower.

THDi at the fan, TDD at the PCC

A night-time 40% THDi reading on a lightly loaded EC fan wall can be 4% TDD at the point of common coupling. IEEE 519-2022 limits TDD, relative to maximum demand current, and the limit steps with ISC/IL at the PCC. Decide on active filtering from a study, not one feeder reading.

InsightRead