
Working alongside in-house engineering teams
When an owner's team and an outside engineer both believe they own the design basis, a sensible energy change can break a room's humidity control. Agreeing one design basis owner, a RACI for shared parameters and a change route at project start keeps decisions where everyone expects them.
InsightRead



