
Duct velocity limits for GMP supply mains and branches
Shrinking a 10,000 m³/h duct from 700 × 500 mm to 600 × 400 mm raises velocity from about 8 to 12 m/s and velocity pressure from 38 to 80 Pa, so every fitting costs about twice. Set separate limits for mains and branches in the design basis.
InsightRead



