Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Life Sciences

Life Sciences

4 articles tagged #ElectricalPower.

GMP on the electrical side

Where a SCADA, BMS or EMS records GMP-relevant data, access control, clock synchronization, alarm records and audit trails are decided by the electrical and automation engineers. Many sites keep those parameters on a separate validated EMS. Humiley's cross-functional training covers GMP, validation and project management.

InsightRead

IEC 62040-3 classes UPS by how much supply disturbance reaches the load. Double-conversion VFI units keep motor-start sags, feeder transfers and generator hunting away from EMS servers and controllers; line-interactive VI units pass some through. The cost is losses, and eco mode quietly lowers the class.

InsightRead

A single AHU replacement in a live GMP plant carries every constraint of a large project: a short shutdown window, existing connections, a pressure cascade to re-prove and change control before fabrication or any site work starts. Planned well, requalification stays short. Planned badly, a weekend job becomes a two-week deviation.

Read