Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

156 articles tagged #EUGMP.

Set a device assembly room's class from the product's risk

ISO 13485 §6.4.2 asks for documented contamination control without naming a cleanroom class. Setting the class from sterilisation method, patient contact and bioburden sensitivity often lands device assembly at ISO 8, with ISO 7 only where needed, less air than Grade C, a smaller AHU and a reason an auditor can read.

InsightRead

From Viet Nam to Europe: three registration pathways

A Vietnamese manufacturer can reach the EU market by acquiring a marketing authorisation and transferring the site, by new registration via technology transfer, or by in-house development. All three need an EU GMP site and quality system, an EU-based MAH, a Qualified Person and pharmacovigilance.

InsightRead

PW and WFI: sampling points are drawn on the P&ID

EU GMP Annex 1 (2022) clause 6.13 expects sampling at all outlets and points of use, worst-case locations considered, and a representative sample of manufacturing water every day. That only works if reachable sample valves, sub-cooler outlets, the loop return and flushing drains are on the P&ID before isometrics.

InsightRead

Periodic requalification: what is retested and how often

EU GMP Annex 1 (2022) sets maximum requalification intervals: 6 months for Grade A and B cleanrooms and 12 months for Grade C and D. Classification, HEPA leak tests, airflow volume, pressure differentials and air velocity, or recovery where airflow is not unidirectional, are retested. A risk assessment can shorten these intervals, never extend them.

InsightRead

Before changing an inherited facility or design, a written gap assessment against the URS and target regulations gives management and inspectors the same picture: evidence from documents and spot measurements, findings graded by risk, and the fix, cost range and schedule impact of each, plus what can stay.

InsightRead

A month-end note from Tony Nguyen, CEO

After more than twenty years with automation vendors and running an EU-GMP EPC contractor, Tony Nguyen saw problems start at the handovers between companies rather than inside any one scope. This note explains why Humiley is organized as one accountable team across design, project management, equipment and maintenance.

InsightRead

EU GMP Annex 15 (2015) treats three consecutive PPQ batches as a common minimum, with the number justified from risk; the FDA's 2011 guidance names no count and works in three stages. A rationale that serves both draws on commercial-scale variability, parameters near their proven limits, prior knowledge and a statistical target on the CQAs.

InsightRead

EU GMP Annex 1 (2022) gives WFI circulation above 70 °C as an example of minimizing the risk of microbial growth. Keeping a loop hot drives the design: ASME BPE dead legs of L/D ≤ 2, turbulent flow to the last user point, planned sanitization and sensors on the return. The CCS should justify all of it.

InsightRead

The room data sheet changes jobs at qualification

A room data sheet begins as a design input that changes weekly and ends as the qualified record behind OQ, PQ and monitoring limits. Each role needs different revision control. Agree the freeze point before DQ, so design and QA are never editing different versions of the same room.

InsightRead

The ISO 14644-3 recovery test times a 100:1 fall in particle concentration after an aerosol challenge and measures the air system. The Annex 1 clean-up period, under 20 minutes as a guidance value and set during qualification, describes the room after real operations. Write the recovery test into the URS and set the clean-up period at in-operation qualification.

InsightRead