
Holding ±2% RH starts with where the sensor sits
At 21 °C and 50% RH, a sensor reading 0.5 K warm reports humidity about 1.5% RH low, most of a ±2% RH band. Wall sensors near doors read their corner, return-duct sensors lag, slow sensors make the loop hunt and drift takes the rest. Sensor position is a design decision.
InsightRead


