At 21 °C and 50% RH, a sensor reading 0.5 K warm reports humidity about 1.5% RH low.
Against a ±2% RH band, that leaves little for the equipment.
Near room conditions RH moves by roughly 3% RH per kelvin at 50%, because it depends on temperature as much as on moisture. A dehumidifier that can hold ±2% RH will only do it if the sensor sits at the room's temperature and sees the room's air quickly. Add a transmitter accuracy of ±1.5% RH and most of the band is spoken for before drift.
Where it tends to go wrong:
- A wall sensor near a door, a heat source or a supply diffuser reads its corner, and its corner's temperature, rather than the room.
- A sensor in the return duct reads the mixed average and sees changes late, so the loop reacts to what happened a few minutes ago.
- A slow sensor, or one inside a housing with little airflow, adds lag the tuning never accounted for, and the dehumidifier hunts.
- Drift between calibrations takes another slice of the band. The interval matters as much as the model.
Retuning the PID fixes none of these. They are settled at design: a location that represents the controlled zone, a short path, and a sensor class and calibration interval chosen against the band that was promised. In semiconductor micro-environments a ±2% RH band is a common requirement, and the sensor position is worth marking on the drawing.
Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)




