
Same ePM1 rating, different energy use
ISO 16890 rates what a filter captures; Eurovent energy classes, A+ to E, compare what it costs to run at reference conditions. Two ePM1 70% filters 50 Pa apart in average pressure drop differ by about 2,000 kWh a year at 10,000 m³/h. Ask for the class and the pressure drop at your airflow.
InsightRead

