Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

11 articles tagged #EnergyEfficiency.

Same ePM1 rating, different energy use

ISO 16890 rates what a filter captures; Eurovent energy classes, A+ to E, compare what it costs to run at reference conditions. Two ePM1 70% filters 50 Pa apart in average pressure drop differ by about 2,000 kWh a year at 10,000 m³/h. Ask for the class and the pressure drop at your airflow.

InsightRead

IT-OT Convergence

For decades, IT (Information Technology) and OT (Operational Technology) existed as two parallel worlds within an enterprise — IT managed data, emails, office software, and network security; OT managed machinery, production lines,…

InsightRead

Many investors mistakenly view a Battery Energy Storage System (BESS) as merely a giant "backup generator" or a passive power bank. This view overlooks its true potential. In reality, BESS is a powerful financial and engineering…

InsightRead