
Sizing the fresh-air intake louvre for monsoon rain
Wind-driven rain past a plain louvre soaks the first filter stage of a fresh-air AHU. A 10,000 m³/h intake needs about 1.4 m² of louvre at 2.0 m/s, or 2.8 m² at 1.0 m/s, and the slower louvre admits less water. Add a drained plenum, a cleanable screen and an ISO Coarse first stage.
InsightRead


