In the wet season, the first thing an outdoor-air intake filters is rain.
A fresh-air AHU in southern Viet Nam sees heavy rain from about May to November. Wind-driven rain gets past a plain louvre, soaks the first filter stage and runs along the casing floor. A wet pre-filter loads faster, can pass water to the stage behind it, and gives growth a place to start.
Much of the fix is louvre size. A 10,000 m³/h intake moves 2.8 m³/s. At 2.0 m/s face velocity that needs about 1.4 m² of louvre; at 1.0 m/s, about 2.8 m². Rain-defence louvres are tested for how much water they let through at a stated velocity, and the small, fast louvre admits more of it. Ask the maker for rain-penetration data at your velocity, and put a drained plenum behind it.
Two more things belong at the intake. An insect screen someone can reach and clean: night lighting near the intake draws insects, and a clogged screen adds pressure drop the fan has to make up. And an ISO Coarse first stage, to catch leaves and insects before the ePM stages load up.
Placement does the rest. Keep the intake away from cooling towers, exhaust stacks and loading bays, and high enough that roof ponding in a downpour cannot reach it.
The bigger louvre costs wall space and a coordination argument with the architect, once. We think that is worth having at design stage.
Industries



