Skip to content

Renewable Energy

One dry room, one shared AHU, one expensive dew point

  • Renewable Energy
  • 1 min read

The driest room on a shared AHU sets the dew point for every room it serves.

At 20 °C, 30% RH is a dew point of about 1.9 °C; 45% RH is near 7.7 °C. Put both on one AHU and the supply air has to leave at the lower of the two. The mass balance leaves no choice: a room can only be as dry as the air it receives, and a common AHU gives every room the same air. So every cubic metre going to the 45% rooms is dried to a 1.9 °C dew point as well.

That costs twice. A chilled-water coil will not get air down to a 1.9 °C dew point in practice, so the whole airflow now needs desiccant or a very cold coil. Then the overdried air is reheated to supply temperature for rooms that never asked for it, and where RH is tightly controlled, some of it gets rehumidified.

There are two usual ways out. Group rooms by dew point rather than by floor or department, so the one dry process gets its own small system. Or hold the shared AHU at the 7.7 °C level and treat the dry room locally, with a small desiccant unit on its own recirculation.

Neither is free. A second AHU needs plant space, and a local dryer is one more item on the maintenance plan. The calculation decides, and it should be done before the zoning drawing is frozen, because moving a room to another AHU later means new ductwork.

The figures are a worked example from the psychrometric equations, not project data.

Related

More on this subject

Where a desiccant rotor loses its capacity

Desiccant rotors lose capacity slowly: worn sector seals let wet air cross over, a slipping drive slows the rotor, dust and solvent vapour foul the media. Measuring outlet dew point, airflow and reactivation temperature against the commissioning record shows the trend before a −60 °C dry room does.

InsightRead