Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Renewable Energy

Renewable Energy

1 article tagged #EUGMP.

Pharma habits in a battery dry room

In a Li-ion dry room at −60 °C dew point and below, extra air changes do not help: return air often passes back through the desiccant rotor, so more supply air means a bigger rotor and more regeneration heat. Size airflow from the moisture balance; pressure control, airlocks and envelope sealing carry over from pharma.

InsightRead