Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

13 articles tagged #ISO14644.

Why a capture hood can misread a swirl diffuser

A capture hood throttles the terminal it measures and assumes an even flow across its sensing grid, so on a swirl diffuser it can read well off the true airflow, in either direction. Name the method per terminal type in the protocol, use back-pressure compensation, and check the hood against a duct traverse.

InsightRead