Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

27 articles tagged #BMSEMS.

A point-to-point loop check, from the device to the screen

Two swapped sensor cables pass the checks made from the desk. A point-to-point loop check finds them: identify the device by tag, follow the wiring to its I/O channel, apply a known input at the device, confirm value, unit and tag on the graphic, trend and alarm, then sign the loop sheet.

InsightRead

ALCOA+ on the EMS is a design requirement

Environmental monitoring and BMS data that support GMP decisions must meet ALCOA+. In practice that means individual logins, time-synchronized controllers, an audit trail users cannot disable, alarms acknowledged with name and comment, and tested backups, with GMP-critical parameters separated early onto a validated system.

Read