
Open ductwork on site and short-lived terminal HEPAs
Construction dust left in supply ducts ends up in the terminal HEPA filters, which then load in months. Order ductwork factory-cleaned and capped, store it off the floor, re-cap every open end at the end of each shift, inspect and wipe each section before connection, and fit the terminal filters last.
InsightRead


