
0.14 m³/h of chilled water per kW at a 6 K difference
At a 6 K difference each kW of cooling needs about 0.14 m³/h of chilled water, so 500 kW moves about 72 m³/h. When return water falls to 10 °C the same load needs 50% more water and, on a fixed system, about 3.4 times the pump power. Two-way valves and a watched return temperature protect the design difference.
InsightRead


