Your first site visit will teach you more than a month of drawings, if you arrive knowing what you came to find.
Plenty of juniors walk a site behind a senior, take forty photos of things they cannot name the next day, and go home. A little preparation changes what the same two hours give. Tick these off:
- The latest revision of the drawings for the area is in hand, checked against the drawing register that morning.
- Site induction is booked and you have the PPE that site asks for. If the route crosses a clean area, ask about gowning first.
- In the bag: tape or laser measure, torch, camera, notebook, marker.
- Three things to find are written down, one of them above a ceiling and one inside a plant room.
- Notes are written up the same day, each photo tied to a drawing number and a location.
On site, take the wide shot before the close-up, with the equipment tag in frame, and measure what the drawing assumes. The beam that takes 200 mm out of a ceiling void is rarely on the HVAC section.
Our graduates learn through fundamentals and on-the-job training designed with lead engineers from the USA.
What did your first site visit show you that no drawing had?
Topics




