Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

98 articles tagged #EngineeringDesign.

What crosses an open cleanroom door

A 10–15 Pa differential between grades exists only while the door is shut. Once it opens, door swing, the operator's wake and any temperature difference between rooms drive air both ways. Holding adjacent rooms at the same temperature, keeping door-open time short and interlocking airlocks keep the exchange small.

Read