Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Engineering Solution & Consultancy

Engineering Solution & Consultancy

5 articles tagged #Annex1.

Trend the pressure cascade, don't just alarm it

The typical differential between adjacent grades is 10–15 Pa, and alarms catch only the failure. A room pair drifting from 14 to 11 Pa has not alarmed, yet something changed. Plot the daily median of each differential against its commissioned value and review it weekly.

InsightRead

Read Annex 1 clause by clause before the inspection date

A Grade B room never retested for recovery after a ductwork change is an easy inspection finding, and six months earlier it is ordinary planned work. A written review reads Annex 1 clause by clause and gives each gap one row: clause, current state, risk, fix and rough size, finished before an inspection date is set.

InsightRead

Engineering Solution & Consultancy

Performance Beyond the Surface

Cleanroom surfaces look like a finishing trade and behave like a performance system. Wall, floor and ceiling finishes decide whether a room can be cleaned to its classification, how long it survives a sporicidal regime, and how much particulate it sheds back into the air it was built to keep clean.

InsightRead