Check each door's RDS value against the monitoring SOP

  • Engineering Solution & Consultancy
  • 1 min read

At OQ, a Grade C door designed for 15 Pa can turn out to have an alarm band copied from an older drawing.

The design differential sits on the room data sheet (RDS), and months later someone else turns it into alarm limits, a trend and an operator response in the pressure-cascade monitoring SOP. Nobody is asked to compare the two until the qualification team does it for them.

In the meantime they drift. A drawing revision can change a door's design value without anyone updating the SOP, or an SOP edit can widen an alarm band outside change control. Occasionally the low limit ends up under the 10 Pa that Annex 1 gives as guidance between adjacent grades.

The check before OQ needs one table with a row for every door: the RDS revision the system was balanced to, the design differential on it, and the high and low alarm limits in the current SOP. Any row where the numbers disagree traces back to one of those two gaps, and a document change now costs less than a deviation raised during OQ.

Humiley's internal templates include 34 standard pharma room data sheets and a room pressure-cascade monitoring SOP.

Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)

Industries

Related

More on this subject

Both states are required; only the stage is a choice

A 50 m² Grade B room needs 10 classification locations under ISO 14644-1:2015, and EU GMP Annex 1 requires them at rest against ISO 5 and in operation against ISO 7, with the smoke study in both states. Whether each run sits in OQ or PQ is for the URS and risk assessment to justify.

InsightRead

The CCS is where design decisions get defended

Under EU GMP Annex 1 (2022), the Contamination Control Strategy has to connect barriers, airflow, personnel and material flows, cleaning, utilities and monitoring. A useful test for any CCS: every line should point to a drawing, calculation or test, not to a procedure written after construction.

Read