The vendor drawing review before fabrication
Substitutions reach site through vendor drawings approved in a hurry. Before releasing fabrication, check the duty point at design conditions, materials in the air path, clearances against the BIM model, sensors against the BMS I/O list, and the certificates and FAT procedure that must come with the unit.