Every cleanroom luminaire is a hole in the ceiling with a light in it, and that ceiling is part of the room's pressure boundary.
Most of the specification follows from which side of that hole the electrician works on. With a room-side maintainable fitting, the LED module or driver is changed from below, with no walkable ceiling. Every repair then opens the room seal and needs a permit, a clean-down and a gasket check, and a driver on the room side puts its heat into the room air. Void-side access keeps the room closed, but only where the void can be reached and the fitting is built for it. In Grade A and B rooms that is worth a lot.
Whichever side, the room-side face has to be flush, with a continuous gasket to the ceiling panel and no screws or ledges to hold particles. The housing has to survive the site's disinfectants, so ask for chemical resistance data against the agents actually in use, sporicides and hydrogen peroxide included. An IP rating does not tell you that.
In unidirectional airflow the ceiling belongs to the filters. Luminaires move to the edges, or into teardrop fittings on the grid that disturb the flow least. Illuminance comes from the task, with EN 12464-1 the usual reference, and visual inspection points often need more light than the general room.
Cleanroom ceilings and panels are in Humiley's equipment scope, and our design is BIM-coordinated.