
Coil face velocity and moisture carry-over
Above about 2.5 m/s face velocity, a wet cooling coil carries water onto the next section, a microbial risk in a hygienic AHU. A smaller coil face saves casing size but adds an eliminator, higher pressure drop and fan energy. At 5 m³/s, 2.5 m/s needs a 2 m² face.
InsightRead



