PTFE membrane media usually reaches a HEPA class at a lower pressure drop than glass fibre, and it reacts differently to leak-test aerosol.
EN 1822 classes the filter, not the medium. An H14 is an H14 whichever paper is folded inside. The choice shows up elsewhere.
Glass-fibre media is the long-standing HEPA paper. It filters through a deep web of fine fibres and has decades of installed leak testing with oil aerosols such as PAO or DEHS behind it. It is brittle. A crease, a thumb through a pleat or a filter dropped at a corner can leave a leak that only the scan finds.
PTFE membrane is a thin expanded film on a support layer. For the same class it generally runs at a lower pressure drop, which is fan energy on every hour the AHU runs. It tolerates handling better, it is chemically inert and it sheds very little, which is why semiconductor projects often choose it. The thin membrane catches oil droplets on its surface, and filter makers commonly limit how much oil aerosol it should see over its life.
That matters in a pharma plant, where terminal filters are scanned at every requalification. Before specifying PTFE, get the filter maker's written position on the test aerosol and concentration, and write the matching method into the requalification SOP.
Which aerosol does your requalification contractor use on PTFE filters?
Industries



