
Clean build protocol: staged rules and a gate before each
Dust built into a cleanroom is slow to remove. A clean build protocol stages the rules: dirty work first, then a closed envelope with no cutting inside, HVAC on temporary filters, a final clean with gowning, and terminal HEPA filters fitted last. Each stage needs an inspection and a signature before the next begins.
InsightRead


